Awaiting decisionEnergy

Micknanstown, Ardcath, Co. Meath

Installation of a 0.8MW solar panel array on a 1.26-hectare site in Ardcath.

2560412 · Meath County Council · Lodged 24 April 2025

Reference
2560412
Authority
Meath County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
24 April 2025
Residential units
1
Floor area
1.264 m²

Summary

AI-generated

The development consists of a 0.8MW solar photovoltaic array designed to meet the operational needs of Boyne Valley Meats. It includes up to 3,820 square metres of ground-mounted solar panels, electrical equipment, security fencing, and connection to an existing sub-station.

Energysolargreen energyindustrial

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of planning permission for 0.8mw kwp (kilowatt – peak ) solar photovoltaic ( pv ) array designed to meet the operational needs of boyne valley meats on a 1.26 hectare site. The proposed development also includes; (a) up to 3,820 sq. Metres of solar photovoltaic panels on ground mounted steel frames, (b) electrical equipment pad, (c) underground power and communication cables and ducts, (d) boundary security fencing, (e) 5 metre buffer zone all round site perimeter, (f) temporary construction compound, (g) set-back of existing agricultural entrance for temporary access from l50461 public road (h) connection to existing sub-station previously granted permission under planning reference 23/114 (i) all associated site works.

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received24 April 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.