Planning Permission Ireland
Awaiting decisionDecision due in ~4 weeks (19 August 2026)

On a site at lands located in the townland of “Crowpark 1st Division” Trim Co. Meath. The main development site is bounded to the north by Kildalkey Road (L-4022) to the east by the Elder Grove residential estate to the west by agricultural lands, t

Permission for a large-scale residential development - permission for a large-scale residential development (lrd) on this site of approximately 6.087 hectares (gross) at lands…

2660788 · Meath County Council · Lodged 25 June 2026

Reference
2660788
Authority
Meath County Council
Register status
In progress
Type
PERMISSION
Received
25 June 2026
Residential units
127
Floor area
18920 m²

Official record

Development description

Permission for a large-scale residential development - permission for a large-scale residential development (lrd) on this site of approximately 6.087 hectares (gross) at lands located in the townland of “crowpark 1st division,” trim, co. Meath. The main development site is bounded to the north by kildalkey road (l-4022), to the east by the elder grove residential estate, to the west by agricultural lands, and to the south by lands adjoining the river boyne. To facilitate a foul sewer connection to the existing public network, the red line boundary extends south-east, passing beneath the river boyne, and continuing underneath trim pitch and putt club lands, then south along jonathan swift street, terminating directly adjacent the office of public works offices on jonathan swift street. The proposed development will consist of 183 no. Residential units (16 no. 1-bed, 40 no. 2-bed and 127 no. 3- and 4-bed units) and a creche. The residential mix will comprise 127 no. Houses (19 no. Detached 4-bed houses, 9 no. Semi-detached/end-terrace 4-bed houses, 4 no. Detached 3-bed houses, 43 no. Semi-detached/end-terrace 3-bed houses and 52 no. Mid-terrace 3-bed houses) and 56 no. Apartments (16 no. 1-bed and 40 no. 2-bed units). The development will include 2 no. Apartment blocks of up to 4 storeys in height. Houses will range from 2 to 2½ storeys in height and will comprise a mix of detached, semi-detached, end-terrace and mid-terrace dwellings. The creche will be a two-storey stand-alone building (c. 394 sq. M), with associated open space, car parking and a dedicated set-down area. All residential units will be provided with private amenity space in the form of balconies or gardens. The development will also include public and communal open spaces. The proposed development will be served by a new single vehicular access road from kildalkey road as well as additional pedestrian access points. Provision has been made for potential future pedestrian and cyclist-only connections via the residential estate to the east. The development will include the provision of a pumped foul sewer connection to the existing foul sewer located on jonathan swift street. The works will involve installation by horizontal directional drilling (hdd) of a rising main beneath the river boyne. The development will also include all associated site development works, including 348 no. Car parking spaces and 147 no. Cycle parking spaces; public, communal and private open spaces; landscaping; ......

Land-use zoning

What this land is zoned for

A2 - New ResidentialR1
New Residential

National zoning type: New/proposed residential

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
55 Eldergrove, Trim, MeathJun 2026€385,000165 m
25 Elder Grove, Trim, MeathApr 2025€336,000293 m
1 Pinebrook, Kildalkey Road, TrimJun 2025€335,000332 m
3 Pinebrook, Trim, MeathMay 2026€400,000349 m
135 Kirwan Ave, Avondale, TrimDec 2025€420,000388 m
38 Butterstream Manor, Trim, MeathApr 2026€455,000391 m
44 Butterstream Manor, Trim, MeathDec 2025€385,000400 m
114 Cedar Grove, Avondale, TrimJan 2025€357,000404 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 June 2026
  2. Decision due19 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.