Planning Permission Ireland
GrantedNew dwellingDecided 7 March 2018

Brownstown, Kentstown Navan, Co. Meath

Construction of a new detached house and retention of an extension to the existing house in Kentstown.

AA180022 · Meath County Council · Lodged 12 January 2018

Reference
AA180022
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
12 January 2018
Residential units
1
Floor area
174.8 m²

Summary

AI-generated

The development consists of planning permission for a new part single and part storey-and-a-half detached house with solar panels and a new wastewater treatment unit. It also seeks retention permission for a ground floor extension to the front of the existing house and a relocated wastewater system.

New dwellingone off housesolarretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists of planning permission for a new detached dwelling house to the side of the existing dwelling house and retention permission for works to the existing detached dwelling house, details as follows (a) planning permission for a part single and part storey and a half detached dwelling. Roof mounted solar panels, new vehicular entrance gateway in lieu of the existing field gate, new proprietary waste water treatment unit and percolation area along with all associated services, service connections, landscape and site development works. (b) planning permission for a new relocated proprietary waste water treatment unit and percolation for the existing detached dwelling in lieu of the existing septic tank. (c) planning permission for retention of the ground floor extension to the front of the existing dwelling house created by enclosing the covered area, along with associated elevational changes

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 December 2020.

Notified floor area: 168.35

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Veldonstown, Brownston, NavanDec 2025€175,000388 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 January 2018
  2. Decision due8 March 2018
  3. Decision issued7 March 2018
  4. Grant issued13 April 2018
  5. Permission expiry12 April 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.