Planning Permission Ireland
GrantedExtensionDecided 18 October 2018

Boolies Great, Duleek, Co. Meath A92V3KO

A large two-storey rear extension, swimming pool extension, double garage, and retention of boundary walls in Duleek.

AA180529 · Meath County Council · Lodged 23 May 2018

Reference
AA180529
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
23 May 2018

Summary

AI-generated

The proposed works include a two-storey rear extension linked to the existing bungalow, a single-storey swimming pool extension, and a front porch. It also features a detached double garage, internal alterations, a wastewater system upgrade, and the retention of existing boundary walls and gates.

Extensionextensionswimming poolgarageretention
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Development will consist of the following works
  • A proposed two storey extension to the rear with a single storey link extension to the existing bungalow comprising of a kitchen, dining & living area, utility room, games room and gym at ground floor level and three no. Bedrooms, two ensuite toilets and a bathroom at first floor level
  • A proposed single storey swimming pool extension to the rear
  • Internal and external alterations works to the existing bungalow
  • A single storey porch extension to the front of the existing bungalow
  • A proposed single storey double garage and workshop to the side garden 6 an upgrade of the wastewater treatement system to an aquamax waste water treatment system and
  • The retention of the existing two metre high front and side masonry boundary walls with two metre high timber entrance gates

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received23 May 2018
  2. Further information received25 September 2018
  3. Decision due22 October 2018
  4. Decision issued18 October 2018
  5. Grant issued5 December 2018
  6. Permission expiry4 December 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.