Gormanston Road, Stamullen, Co. Meath
Amendments to a permitted residential development to reconfigure and redesign 97 housing units.
AA200833 · Meath County Council · Lodged 30 June 2020
- Reference
- AA200833
- Authority
- Meath County Council
- Register status
- Withdrawn
- Type
- PERMISSION
- Received
- 30 June 2020
- Residential units
- 97
- Floor area
- 11620 m²
Summary
AI-generatedThe application seeks to amend a previously permitted residential development of 205 units on a 9-hectare site. The proposed changes will reconfigure and redesign the remaining units in Phase 1A and Phase 2 to provide a total of 97 units, consisting of semi-detached, terraced, and detached houses.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The proposed development will consist of the amendment of the permitted residential development of 205 no. Units (meath county council reg. Ref. Aa/ 170505 which itself amended sa/900975 (an bord pleanala ref. Pl. 17.237144)) on a site of c. 9 ha. The proposed development relates to phases 1a, 2 and part of phase 3 of the lands. Phase 1 comprises a total of 81 no. Units and was approved as part of the overall permission under meath county council reg. Ref. Aa/170505, some 51 no. Units of which are currently under construction/constructed. The proposed development will provide for the reconfiguration and redesign of the remaining units in phase 1 yet to be constructed (phase 1a) and phase 2 to provide a total of 97 no. Units. Phase 1a will comprise 38 no. Units (increased from 30 no. Units) and phase 2 will comprise 59 no. Units (increased from 44 no. Units). The developments of 97 no. Units will consist of 44 no. Semi-detached units (three bed units) and 42 no. Terraced units (comprising 14 no. Two beds units and 28 no. Three bed units), and 11 no. Detached units (comprising 2 no. Four bed units and 9 no. Three bed units). The application also provides for the piped infrastructure, road and footpath network and open space provision for the balance of phase 3 development lands. For clarity, no housing units are proposed for phase 3 under this planning application (but will be sought under a future application). Additional works include: reconfiguration of the internal road and footpath layout including potential future pedestrian and road links; amendments to hard and soft landscaping; amendments to drainge infrastructure; boundary treatment works; construction of 2 no. Esb sub-stations; provision of associated car parking; and all associated works including site excavation, infrastructural and site development works above and below ground
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 1 The Mews, Silver Banks, Stamullen | Feb 2026 | €515,000 | 42 m |
| 11 Grange Rise, Stamullen Gormanston, Meath | Sept 2025 | €360,000 | 52 m |
| 35 The Park, Stamullen, Co Meath | May 2026 | €590,000 | 129 m |
| 9 Grange Close, Stamullen, Meath | Feb 2026 | €340,000 | 141 m |
| 22 The Park, Silver Banks, Stamullenprice excludes VAT | Jun 2025 | €409,692 | 149 m |
| 16 The Park, Silver Banks, Stamullenprice excludes VAT | Jun 2025 | €405,286 | 149 m |
| 5 The Park, Silver Banks, Stamullenprice excludes VAT | Jun 2025 | €392,070 | 149 m |
| 15 The Park, Silver Banks, Stamullenprice excludes VAT | Jun 2025 | €405,286 | 149 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received30 June 2020
- Further information requested21 August 2020
- Application withdrawn12 October 2020
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionHousing estate
The proposed development will conssist of the amendment of the permitted residential development of 205 no.…
Stamullen & Gormanston , Gormanston Road , Co. Meath
AA200761MeathLodged 19 Jun 2020
- GrantedHousing estate
The development will consist of:(i) construction of a residential development comprising 102 no. residential…
Friarspark 2nd Divison & Effernock , Maudlin , Trim Co. Meath
23930MeathLodged 27 Sept 2023
- Awaiting decisionHousing estate
(i) construction of a residential development comprising 85 no. houses (6 no. two-bedroom houses, 53 no.…
Lands to the east of the M1 Motorway and west of , Rathmullan Road , Rathmullan Drogheda Co Meath
23264MeathLodged 13 Mar 2023
- GrantedHousing estate
Amendments to the south-eastern portion (0.7ha) of a residential development permitted under Meath County…
Lands to the North of the Windtown / Proudstown link road , Clonmagadden , Navan
21304MeathLodged 18 Feb 2021
- GrantedHousing estate
The development will consist of revisions and alterations to the existing permitted residential scheme as…
Veldonstown Road , Kentstown , Co. Meath
2560593MeathLodged 12 Jun 2025
- GrantedHousing estate
Amendments to the south-eastern portion (0.71ha) of a residential development permitted under Meath County…
Lands to the north of the Clonmagaddan Road , Clonmagaddan , Navan Co Meath
221558MeathLodged 1 Dec 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.