Planning Permission Ireland
GrantedEnergyDecided 20 January 2017

Julianstown East Julianstown West and, Ninch, Co. Meath

Development of a 20 MW solar farm with up to 88,800 solar panels and a substation in Meath.

LB160998 · Meath County Council · Lodged 13 September 2016

Reference
LB160998
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
13 September 2016

Summary

AI-generated

The development consists of a solar photovoltaic panel array with a maximum export capacity of 20 MW on a 43-hectare site. It will feature up to 88,800 ground-mounted solar panels, a 38kV substation, battery storage, and 20 transformer/invertor stations.

Energysolarrenewable energysubstationbattery storage
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the development of a solar photovoltaic panel array with a maximum export capacity of 20 mw, comprising up to 88,800 no. Solar panels on ground mounted steel frames, 1 no. On site 38kv substation (consisting of single storey substation control building, transformers, battery storage container and associated cabling and infrastructure), 20 no. Electrical transformer/invertor station modules, undergound cable ducts, hardstanding areas, perimeter fencing and security gates access tracks, cctv and all associated site services and works on a site area of 43 hectares, located in the townlands of julianstown east, julianstown west and ninch, co. Meath. Permission is sought for 10 years. The application is accompanied by a natura impact statement

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received13 September 2016
  2. Further information received22 December 2016
  3. Decision due27 January 2017
  4. Decision issued20 January 2017
  5. Appeal submitted15 February 2017
  6. Appeal decided13 March 2018
  7. Permission expiry12 March 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.