GrantedExtensionDecided 18 March 2020

Lismahon, Batterstown, Co Meath

First-floor extension over a bungalow in Batterstown, plus retention of existing single-storey extensions.

RA191207 · Meath County Council · Lodged 13 September 2019

Reference
RA191207
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
13 September 2019
Residential units
1
Floor area
65 m²

Summary

AI-generated

Permission is sought for a first-floor extension over an existing bungalow, including refurbishment, window replacement, and vehicular access alterations. The application also seeks retention for existing side and rear single-storey extensions and a wastewater treatment system.

Extensionextensionretentionrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A. Proposed first floor level extension centred over bungalow, associated external and internal alterations, refurbishment of existing dwelling, windows replacement, stove chimney flue, alteration of vehicular access and front boundary treatment to form safe traffic compliant access with all associated landscaping site development works to dwelling house. B. Retention of side and rear single storey extensions to bungalow; revised site boundaries; minor relocation of entrance; waste water treatment system environmental protection agency compliant (replaced old septic tank) with associated site development works; and to include for all ancillary site works from that previously granted under planning file reference number 75/269 for the erection of a dwelling. Significant further information/revised plans submitted on this application

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received13 September 2019
  2. Further information received23 January 2020
  3. Decision due22 March 2020
  4. Decision issued18 March 2020
  5. Grant issued6 July 2020
  6. Permission expiry5 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.