Planning Permission Ireland
GrantedIndustrialDecided 22 September 2016

Lansdown Killaskillen, Kinnegad, Co. Meath

Construction of an industrial building and conveyor system for solid recovered fuel refinement in Kinnegad.

TA160840 · Meath County Council · Lodged 3 August 2016

Reference
TA160840
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
3 August 2016

Summary

AI-generated

The development consists of constructing an industrial building and related infrastructure to refine solid recovered fuel (SRF) used in cement manufacturing. It includes an external yard, an internal road extension, a conveyor feed belt to the existing SRF building, and ancillary services like a rainwater harvesting system.

Industrialindustrialcement factorywaste to energy

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of an industrial building and related infrastructure for the purpose of providing an additional refinement process of the solid recovered fuel (srf) currently used and authorised as an alternative fuel source in the cement manufacturing process as permitted under planning permission ref. Ta/150677 & ta/800654. The development works shall consist of; (1) the construction of an industrial structure for the purpose of reception and refinement of the srf materials:; (2) provision of associated external open yard area for vechicualr access and delivery; (3) extension of internal road network to facilitate vehicular access to the new building; (4) conveyor feed belt from the proposed industrial building to the existing srf building inclusive of modified elevation of the existing srf building to facilitate the transfer of the refined srf waste materials to the existing fuel supply chain; and (5) all ancillary site development works including: (a) bypass petrol interceptor, (b) rainwater harvest system, (c) bore-well water supply, (d) underground fire water storage tank with pump and hydrant system, (e) connection to existing storm and foul water systems, (f) signage, and (g) perimeter fencing and landscaping. An environmental impact statement (eis) will be submitted to the planning authority with the appllication. The application relates to development which comprises or is for the purposes of an activity requiring an integrated pollution prevention and control licence (now replaced by an industrial emissions licence)

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received3 August 2016
  2. Decision due27 September 2016
  3. Decision issued22 September 2016
  4. Grant issued27 October 2016
  5. Permission expiry26 October 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.