Planning Permission Ireland
GrantedEnergyDecided 25 September 2020

Friarspark 6th Division, Trim, Co. Meath

An extension to an approved solar farm comprising 28,000 square metres of solar panels.

TA201048 · Meath County Council · Lodged 5 August 2020

Reference
TA201048
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
5 August 2020

Summary

AI-generated

The proposed extension to an approved solar farm will feature approximately 28,000 square metres of photovoltaic panels on steel supports. The project includes 5 transformer cabins, inverters, security fencing, and will provide up to 4 megawatts of additional export capacity.

Energysolarrenewable energyinfrastructure
Floor area
28,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A proposed extension to the planning approved solar farm (ref ta180167). The proposed extension will comprise of photovoltaic panels with a surface area of approx. 28,000 m2 mounted on steel support structures, with associated infrastructure including 5 no. Transformer cabins, inverters, temporary construction compound, ducting and electrical cabling, site entrance, boundary security fencing, mounted cctv cameras, internal access tracks and ancillary works. The solar pv arrays will have a height above ground level of up to 3m and an additional export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i. E. Duration of the planning permission to construct the development) is sought, with an operational life of 30 years after the date of commissioning

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Knightsbridge Court, Longwood Road, TrimMar 2025€315,000359 m
27 Knightsbridge Court, Longwood Road, TrimMay 2025€295,000359 m
16 Knightsbridge Court, Longwood Road, TrimJul 2025€300,000359 m
39 Knightsbridge Court, Knightsbridge Ave, TrimAug 2025€269,000359 m
18 Knightsbridge Court, Longwood Road, TrimDec 2025€330,000359 m
41 Knightsbridge Court, Longwood Road, TrimMar 2026€280,000359 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 August 2020
  2. Decision due29 September 2020
  3. Decision issued25 September 2020
  4. Appeal submitted22 October 2020
  5. Appeal decided24 May 2021
  6. Permission expiry22 May 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.