Planning Permission Ireland
GrantedIndustrialDecided 19 July 2021

Corlattallan, Emyvale, Co. Monaghan

Construction of a part single-storey, part two-storey factory development and extension in Emyvale.

213 · Monaghan County Council · Lodged 7 January 2021

Reference
213
Authority
Monaghan County Council
Register status
Decided
Type
PERMISSION
Received
7 January 2021

Summary

AI-generated

The development consists of a part single-storey and part two-storey factory incorporating processing areas, offices, and loading bays. It also includes a single-storey extension to an existing storage shed for offal processing, solar panels, and a wastewater drip irrigation system.

Industrialfactorysolarindustrial
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of (1) the construction of a part single storey/part two storey factory development incorporating chilling plucking and processing areas, offices, plant rooms, lairage and loading and unloading areas, canteen and hygiene facilities and single storey conveyor linkage to existing factory facility (2) single storey skip storage and plant room (3) construction of 2 no. Underground water storage tanks (4) a single storey extension to side of existing storage shed to incorporate an offal processing facility with permission being sought for the change of use of the existing storage shed for use as an offal processing facility (5) provision of additional car parking facilities, security fencing and access roads (6) connection to existing onsite mains foul sewer, water and drainage services (7) partial removal of existing concrete yard areas and associated structures (8) installation of solar panels to roof structures (9) construction of underground attenuation drainage system (10) completion of all associated site structures and ancillary site works including a treated effluent wastewater drip irrigation system encompassing 8 plots of land spread over c15 hectares with a total disposal volume of up to 430m3 per day. The application relates to a development which comprises an activity that holds an ied licence from the epa. Significant fi relates to tta report and closing existing entrance and utilisation of existing entrance.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 Main St, Emyvale, MonaghanApr 2025€185,022388 m
7a Main St, Emyvale, Main StApr 2025€185,022396 m
15 Oriel Park, Emyvale, MonaghanJul 2026€135,000400 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 January 2021
  2. Further information requested3 March 2021
  3. Further information received22 June 2021
  4. Decision due19 July 2021
  5. Decision issued19 July 2021
  6. Appeal submitted13 August 2021
  7. Appeal decided22 March 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.