RefusedHousing estateDecided 21 February 2022

Edenamo, Inniskeen, Co Monaghan

Construction of a 23-unit residential development including houses, bungalows, and terrace homes in Inniskeen.

21378 · Monaghan County Council · Lodged 24 June 2021

Reference
21378
Authority
Monaghan County Council
Register status
Decided
Type
PERMISSION
Received
24 June 2021
Residential units
1
Floor area
2146.4 m²

Summary

AI-generated

The development comprises 23 residential units, including 4 semi-detached houses, 4 bungalows, 6 semi-detached houses, and 9 terrace dwellings. The project features a mix of private, social, and retirement housing, alongside a new access point, an ESB substation, and communal open space.

Housing estatesocial housinghousing estatesubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for a residential development comprising 23no. Units in total as follows: house type 1
  • 4no. 2 bed semi-detached dwellings, house type 2
  • 4no. 2 bed bungalows, house type 3
  • 6no. 3 bed semi detached dwellings, 9 no. Terrace dwellings (unit mix comprising of 6no. 2 bed terrace dwellings & 3no. 3 bed terrace dwellings), site works to facilitate the proposed development to include general site clearance works. Creation of new access point to the lands from the public road with provision of a new internal access road and footpath to facilitate vehicular and pedestrian access. Provision of associated garden areas and in-curtilage works for each dwelling to include parking and boundary treatments. Provision of 1no. Esb substation. Associated site works and attenuation systems as well as all ancillary site development/construction works. Revised description and significant information submitted. Units 1-11 inclusive as private housing and units 12-23 as a combination of social and retirement housing. Provision of a residential communal open space area to include all hard and soft landscape works within the site which includes public lighting, planting works and boundary treatments. Works to facilitate site drainage and foul networks for connection to the existing foul, storm and water networks along with connection works to the esb network

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Dunard, Inniskeen, DundalkFeb 2026€190,000332 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 June 2021
  2. Further information requested16 August 2021
  3. Further information received28 January 2022
  4. Decision due24 February 2022
  5. Decision issued21 February 2022
  6. Appeal submitted15 March 2022
  7. Appeal decided25 August 2022

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.