Awaiting decisionEnergy

LUMCLOON, CLOGHAN, CO. OFFALY

Extension of a battery energy storage system (BESS) facility in Cloghan.

21778 · Offaly County Council · Lodged 16 December 2021

Reference
21778
Authority
Offaly County Council
Register status
Withdrawn
Type
PERMISSION
Received
16 December 2021

Summary

AI-generated

The proposed development is an extension to an existing battery energy storage system (BESS) facility. It includes the construction of two open-area compounds containing 112 modular battery enclosures and 28 medium voltage power system enclosures, connecting to the grid via the adjoining 110kV Derrycarney substation.

Energybattery storagegrid connectioninfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • An extension to the existing battery energy storage system (bess) facility (consented under planning ref. Pl2/19/55). The proposed development includes for construction of an open area battery energy storage system (bess) compound within the existing bess facility (compound
  • And on lands adjoining the existing bess facility to the south (compound 2), the compounds will be surfaced with clean washed limestone to accord with the existing bess facility. It is proposed to install a total of 112 modular battery enclosures and 28 medium voltage power system (mvps) enclosures. The proposed development will utilise the existing customer (ipp) building and electrical infrastructure on site to connect to the grid via the 110kv derrycarney transmission substation, which adjoins the bess facility. The proposed development will be accessed from the existing bess facility site entrance located along the r357 regional road. A secondary access point will be provided to the development from an existing access point serving the development lands from mill road (l70099 west of the site) and this will be utilised for construction stage works and for emergency use during the operational phase of the development. The development areas will be secured by perimeter fencing

Key dates

Timeline

  1. Application received16 December 2021
  2. Further information requested18 February 2022
  3. Application withdrawn30 August 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.