COOLCOR, RHODE, CO. OFFALY
Development of a 20MW battery energy storage facility (BESS) on a 0.95-hectare site.
19161 · Offaly County Council · Lodged 10 April 2019
- Reference
- 19161
- Authority
- Offaly County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 10 April 2019
Summary
AI-generatedThe project consists of a 20MW battery energy storage facility designed to provide system support services to the electricity grid. It will feature 8 battery enclosures, a single-storey switchgear building, a transformer connecting to the Derryiron substation, and security fencing.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development of an energy storage facility designed to provide 20mw of system support services to the electricity grid on a 0.95 hectare site. The development will comprise: (i) an open area battery energy storage system (bess) compound (area of 563 sqm) containing 8 no. Battery and control system enclosures (c. 12.2m long x 2.5m wide x 4m high), (ii) single storey switchgear building (c. 18m long x 15m wide x 3m high) containing electricial plant and control room, (iii) bunded transformer which will electrically connect the development via overhead cable to the existing 110kv derryiron substation located on lands adjoining the site to the south, and (iv) all ancillary development, including; perimieter palisade fencing with access gate at primary vehicle site entrance which will connect to the existing roads of the adjacent rhode buisiness park providing access to the r400, landscaping, lighting, car parking, internal access roads and all civil engineering works for the disposal of foul and surface water
Key dates
Timeline
- Application received10 April 2019
- Decision due4 June 2019
- Decision issued4 June 2019
- Grant issued11 July 2019
- Permission expiry10 July 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted70 m away
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020Energy
- Awaiting decision70 m away
PL2/20/238 FOR AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
EX26009OffalyLodged 27 May 2026Energy
- Awaiting decision90 m away
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on an existing concrete slabs,…
Coolcor , Rhode , County Offaly
2460472OffalyLodged 28 Nov 2024Energy
- Granted90 m away
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on existing concrete slabs, (ii)…
Coolcor , Rhode , County Offaly
2460479OffalyLodged 3 Dec 2024Energy
- Granted130 m away
EIRGRID PLC (WITH THE CONSENT AND APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)), INTENDS TO APPLY FOR…
DERRYIRON 110KV SUBSTATION , CLONIN RHODE , CO. OFFALY
22664OffalyLodged 21 Dec 2022Infrastructure
- Granted130 m away
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation…
Clonin , Rhode , Co. Offaly
2560345OffalyLodged 31 Jul 2025Energy
- Awaiting decision130 m away
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation…
Clonin , Rhode , Co. Offaly
2560299OffalyLodged 10 Jul 2025Energy
- Awaiting decision140 m away
An Operations Building with a floor area of approximately 285m2. The Operations Building will consist of — 1…
Coolcor , Rhode , Co. Offaly
2560110OffalyLodged 3 Apr 2025Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020
- Awaiting decisionEnergy
PL2/20/238 FOR AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
EX26009OffalyLodged 27 May 2026
- GrantedEnergy
DEVELOPMENT OF AN ENERGY STORAGE SYSTEM (ESS) FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE…
CLONIFFEEN , SHANNONBRIDGE , CO. OFFALY
21295OffalyLodged 11 May 2021
- GrantedEnergy
DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 100MW OF SYSTEM SUPPORT SERVICES TO THE…
LUMCLOON , CLOGHAN , CO. OFFALY
17194OffalyLodged 1 Jun 2017
- Awaiting decisionEnergy
AN EXTENSION TO THE EXISTING BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY (CONSENTED UNDER PLANNING REF.…
LUMCLOON , CLOGHAN , CO. OFFALY
21778OffalyLodged 16 Dec 2021
- Awaiting decisionEnergy
DEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH INTEGRATED CARBON CAPTURE…
COOLCOR , RHODE , CO. OFFALY
20210OffalyLodged 5 Jun 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.