GrantedInfrastructureDecided 27 March 2023

BISHOPSWOOD & TINACRANNAGH, CO. OFFALY

Uprating works on a 1.6km section of an existing 110kV overhead electricity line in County Offaly.

2328 · Offaly County Council · Lodged 31 January 2023

Reference
2328
Authority
Offaly County Council
Register status
Decided
Type
PERMISSION
Received
31 January 2023

Summary

AI-generated

The development involves uprating approximately 1.6km of an existing 110kV overhead line. Works include restringing conductors with higher capacity wires, installing a fibre connection, and replacing wooden polesets, steel masts, and associated hardware.

Infrastructuregridelectricityinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Works associated with the proposed uprate of the existing 110kv line in the townlands of bishopswood and tinacrannagh, co. Offaly. The proposed development (uprate) within the functional area of offaly county council relates to approximately 1.6km of the 110kv line and comprises: (1) the replacement ("restringing") of the existing overhead line circuit conductor and wires with new higher capacity conductor wires including installation of a new fibre communication connection; (2) the replacement of 1 no. Wooden polesets and 1 no. Steel masts - any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace. They will be along the same alignment as existing, the height difference will be up to 4m and they will be of a generally similar appearance, unless otherwise stated; (3) the replacement of crossarms at 1 no. Wooden polesets; (4) the replacement of hardware and fittings such as suspension clamps, insulators, and vibration dampeners at all structures, as required; (5) re-capping and remedial works for shear blocks at 1 no. Steel mast; (6) installation of bird flight diverters; (7) all associated site development works, including foundation upgrade works and strain assemblies; (8) all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing; and (9) other temporary associated and ancillary development works required for the purpose of the uprate of the existing circuit, including temporary guard poles, construction compounds, the installation of silt traps, silt fences, stone tracks, ground protection mats and temporary watercourse crossings. The proposed development is part of a larger project which includes uprate works to approximately 20km of 110kv line within the functional area of laois county council for which a separate planning application has been lodged with laois county council. A natura impact statement (nis) has been prepared for the proposed development

Key dates

Timeline

  1. Application received31 January 2023
  2. Decision due27 March 2023
  3. Decision issued27 March 2023
  4. Grant issued4 May 2023
  5. Permission expiry3 May 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.