Planning Permission Ireland
GrantedRetentionDecided 13 September 2018

Ballinphuill, Tibohine, Castlerea

Retention of alterations to a BioPark facility, including anaerobic digester components and biodiesel buildings.

18281 · Roscommon County Council · Lodged 8 June 2018

Reference
18281
Authority
Roscommon County Council
Register status
Decided
Type
RETENTION
Received
8 June 2018

Summary

AI-generated

Retention permission is sought for various alterations to a previously permitted BioPark facility. These include changes to the office, weighbridge, bio-diesel building, anaerobic digester systems, tanks, and engines. Permission is also sought for an amended control room.

Retentionbioenergyindustrialanaerobic digester

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists/ will consist of the alterations to a previously permitted biopark (register reference pd/08/656) and its associated buildings including an anaerobic digester, rape seed processing, biodiesel production and fuel pelleting. Retention permission is sought for the following alterations and amendments to the layout and structures on the site including alterations to: office, weighbridge, building no. 1 - bio-diesel building (elevation changes only), ad (anaerobic digester) liquid feed system, wheelwash, ad solid feed system, water/process/firefighting tanks, containerised engines, (2 no. ) , minor bases/electrical switches, chiller/blower/filter unit, flare, anaerobic digesters, (digester and post digester) , heat distribution room, containerised pumps ( 2 no. ) pasteuriser and pump, storage tanks (2 no. ) sensor room, wildlife/attenuation pond, other incidental amendments to internal roads, car parking and services. Permission is also sought for amended control room, all associated works and services. (the nature of the proposed use of the facility is unchanged from that previously permitted: namely anaerobic digester, rape seed processing, biodiesel production and fuel pelleting. The scale and intensity of the use and the materials etc. Associated with the use are also unchanged) at

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Ballinphuill, Tibohine, CastlereaApr 2026€240,000324 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 June 2018
  2. Further information requested1 August 2018
  3. Further information received17 August 2018
  4. Decision due13 September 2018
  5. Decision issued13 September 2018
  6. Grant issued18 October 2018
  7. Permission expiry17 October 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.