Planning Permission Ireland
Awaiting decisionEnergy

Leam Ballybaun Harepark Ardoorooran Carrownageeragh, Grange Beg Knockadoobrusna Ballytrasna, Cashelfinoge and Greatmeadow

Construction of two 160-metre wind turbines and associated infrastructure near Boyle.

21276 · Roscommon County Council · Lodged 26 May 2021

Reference
21276
Authority
Roscommon County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
26 May 2021

Summary

AI-generated

Permission is sought for a wind energy development consisting of two wind turbines with a maximum tip height of 160 metres. The project includes a substation control building, an 80-metre meteorological mast, new internal service roads, underground and overground cabling to connect to the Boyle substation, and a temporary construction compound.

Energywind energyinfrastructurerenewables

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development which will consist of the construction of 2 no. Wind turbines (maximum turbine tip height 160m) with associated foundations and crane hardstand area and all associated development including 1 no. Substation control building, 1 no. Permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between turbines within the wind farm site, 3.75km of overground electric cabling system and 1.53km of underground electric cabling system between the wind farm site and connection point at existing 38 kv esbn substation in boyle, 1 no. New site access/entrance off the l-1248 local road at the western boundary to facilitate construction and access, 1 no. Temporary construction site compound (750m2, 4 no. Peat / spoil deposition areas for storage of excess excavated peat materials, associated surface water management system, tree felling to facilitate site development, temporary works on sections of the public road network along the turbine delivery route (including hedge or tree cutting, relocation of powerlines / poles, lampposts, signage and local road widening) and all associated site works( a natura impact statement and environmental impact assessment report has been prepared in respect of the application) at

Key dates

Timeline

  1. Application received26 May 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.