Leam Ballybaun Harepark Ardoorooran Carrownageeragh, Grange Beg Knockadoobrusna Ballytrasna, Cashelfinoge and Greatmeadow
Construction of two 160-metre wind turbines and associated infrastructure near Boyle.
21276 · Roscommon County Council · Lodged 26 May 2021
- Reference
- 21276
- Authority
- Roscommon County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 26 May 2021
Summary
AI-generatedPermission is sought for a wind energy development consisting of two wind turbines with a maximum tip height of 160 metres. The project includes a substation control building, an 80-metre meteorological mast, new internal service roads, underground and overground cabling to connect to the Boyle substation, and a temporary construction compound.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development which will consist of the construction of 2 no. Wind turbines (maximum turbine tip height 160m) with associated foundations and crane hardstand area and all associated development including 1 no. Substation control building, 1 no. Permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between turbines within the wind farm site, 3.75km of overground electric cabling system and 1.53km of underground electric cabling system between the wind farm site and connection point at existing 38 kv esbn substation in boyle, 1 no. New site access/entrance off the l-1248 local road at the western boundary to facilitate construction and access, 1 no. Temporary construction site compound (750m2, 4 no. Peat / spoil deposition areas for storage of excess excavated peat materials, associated surface water management system, tree felling to facilitate site development, temporary works on sections of the public road network along the turbine delivery route (including hedge or tree cutting, relocation of powerlines / poles, lampposts, signage and local road widening) and all associated site works( a natura impact statement and environmental impact assessment report has been prepared in respect of the application) at
Key dates
Timeline
- Application received26 May 2021
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
Permission for development consisting of the construction of 2 no. wind turbines (turbine tip height of 150m,…
The Townlands of Leam Ballybaun , Harepark Ardcorcoran Grange Beg , Knockadoobrusna Ballytrasna
21595RoscommonLodged 21 Oct 2021
- RefusedEnergy
Permission to develop a wind farm and associated works . The proposed development will consist of —…
Rossacurra Cranemore Kilbrannish North Bealalaw Raheenliegh Aclare Co. Carlow ,
2113CarlowLodged 22 Jan 2021
- GrantedEnergy
A ten year permission for the development of a wind farm project. The development will consist of: - the…
In the townlands of , Keerglen Ballykinlettragh and Ballinglen , County Mayo
2460537MayoLodged 29 Aug 2024
- RefusedEnergy
Permission for: The construction of one 4.2 MW wind turbine with overall tip height of up to 150m; The…
Kilcash , Co Roscommon
21221RoscommonLodged 30 Apr 2021
- RefusedEnergy
Ten year planning permission for a Wind Farm Development with a 30 year operational life (from date of…
Coole Monktown Camagh (Fore by) Doon Clonsura Mullagh Boherquill and Joanstown County Westmeath. ,
176292WestmeathLodged 20 Oct 2017
- RefusedEnergy
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South,…
Cahermurphy Knokcnahila More South , Carrownagry South Caheraghacullin , Drummin Doolough Glenmore & Booltiagh Co Clare
20658ClareLodged 18 Sept 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.