Derrane & Roxborough, Roscommon, County Roscommon

Amendments to a wind farm in Roscommon, including larger wind turbines and a relocated access road.

2360180 · Roscommon County Council · Lodged 17 October 2023

Reference
2360180
Authority
Roscommon County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
17 October 2023

Summary

AI-generated

This application seeks amendments to existing planning permissions for a 4.9MW wind farm. The changes include erecting two larger Enercon E138 turbine models (with tip heights of 150m and 168m) in place of previously agreed models, and relocating the access road and underground cabling.

Energywind energywind turbineinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for amendments to (i) extant planning permission pd/18/313, which amended planning application pd/11/126, (ii) extant planning permission abp-303677-19, which amended planning permissions pd/11/126 and pd/18/313 and (iii) extant planning permission abp-307726-20, which amended planning permission pd/18/313. The output from the development will be 4.9mw similar to the extant planning permissions. The amendments will provide for
  • Erection of two bespoke enercon e138 turbines models in lieu of the vensys 121 turbine models agreed with the planning authority, under condition 4(a) of planning permission abp-3037726-19. Turbine t1 will have a hub height of 99m, a blade diameter of 138m and a blade tip height of 168m. Turbine t2 will have a hub height of 81m, a blade diameter of 138m and a blade tip height of 150m. The maximum combined output from the turbines will be 4.9mw
  • Relocation of the access road serving the development, as previously permitted under planning permissions pd/11/126, pd/18/313, abp-303677-19 and abp-307726-20.3. The relocation of underground electrical cabling to the relocated access road referred to under paragraph 2 above and additional underground electrical cabling to the proposed modular windfarm control room/switch room and esb modular mv station referred to in paragraph 6 below
  • Increase in the hub height of turbine t1 to 99m, increasing the blade tip height from 150m to 168m and micro-siting of turbine t1 by 12.75m
  • Increase area of the hardstands associated with each turbine
  • Amended substation structure to incorporate a proposed modular windfarm control room/switch room and an esb modular mv station
  • Revised site boundaries at

Key dates

Timeline

  1. Application received17 October 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.