Planning Permission Ireland
Awaiting decisionInfrastructureDecision was due 11 November 2018

Carrownamaddoo, Ballintogher West ED, Co Sligo

Filling of land with inert soil and construction waste over a 0.5-hectare area.

18374 · Sligo County Council · Lodged 17 September 2018

Reference
18374
Authority
Sligo County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
17 September 2018

Summary

AI-generated

The development consists of filling land with approximately 12,000 cubic metres (20,000 tonnes) of inert soil, subsoil, and construction and demolition waste. The application area covers 0.5 hectares and includes ancillary site works and landscaping.

Infrastructureland fillwaste
Floor area
5,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development consisting of the filling of land with inert soil/subsoil and construction and demolition waste (application area= 0.5 hectares. Approximate volume of fill = 12000 cubic metres (20,000 tonnes)) including associated ancillary site works and landscaping

Key dates

Timeline

  1. Application received17 September 2018
  2. Decision due11 November 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.