Abbeytown townland, Ballysadare, Co. Sligo
Retention of an existing asphalt plant and associated site infrastructure.
19222 · Sligo County Council · Lodged 7 June 2019
- Reference
- 19222
- Authority
- Sligo County Council
- Register status
- Decided
- Type
- RETENTION
- Received
- 7 June 2019
Summary
AI-generatedThis application seeks retention permission for an existing asphalt plant on a site of approximately 1 hectare. The retention includes associated infrastructure such as a laboratory, site office, storage shed, and a weighbridge.
- Floor area
- 1,438 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development consisting of retention of the existing asphalt plant (previously permitted under planning ref. No. 05/53 and abp ref no. Pl 21.213509) and associated infastructure including laboratory (9 sq. Metres), site office (29 sq. Metres) storage shed (1,400 sq. Metres) and weighbridge within an application area of c. 1 hectare.
Land-use zoning
What this land is zoned for
“natural resource reserve”
National zoning type: Strategic reserve, White land
Objective set by the Sligo County Development Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received7 June 2019
- Decision due1 August 2019
- Decision issued25 July 2019
- Grant issued27 August 2019
- Permission expiry26 August 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted290 m away
PP - for development consisting of the continued use and operation of the existing quarry and quarry…
Abbeytown and Kilboglasy towlands , Ballysadare , Co Sligo
1850SligoLodged 23 Feb 2018Industrial
- Granted470 m away
Development consisting of — Partial demolition of an existing rear extension (floor area approx 15m2)
Abbeytown , Ballisodare , Co Sligo
22278SligoLodged 11 Aug 2022Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedRetention
The development consists of the continued use of an existing asphalt plant and associated infrastructure and…
Killaskillen , Kinnegad , Co. Meath
TA161144MeathLodged 24 Oct 2016
- GrantedIndustrial
The development consists of the continued use of the existing asphalt plant, the existing storage shed (837…
Rossmore, Carrigtwohill, Co. Cork,
186874corkLodged 31 Oct 2018
- GrantedIndustrial
For the continued use of an existing asphalt plant and associated infrastructure and structures permitted…
Kilree , Sheastown , Bennettsbridge
18150KilkennyLodged 7 Mar 2018
- GrantedIndustrial
The establishment of an asphalt plant and ancillary site facilities at the site stated above. The proposed…
Belgard Quarry, Cheeverstown, Tallaght, Dublin 24.
SD06A/0915South DublinLodged 2 Feb 2007
- GrantedRetention
Retention permission for the installation and operation of the asphalt plant (replacing the previously…
Cuilreevagh and Largan , Elphin , Castlerea
21668RoscommonLodged 25 Nov 2021
- GrantedIndustrial
For the development of an Asphalt Plant and associated works to include the use of an existing weighbridge,…
Tonroe ,
171438galwayLodged 29 Sept 2017
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.