Planning Permission Ireland
GrantedExtensionDecided 6 April 2022

9 Kingsfort, Ballintogher, Co Sligo

Retention of an attic conversion and construction of a new rear extension in Ballintogher.

2247 · Sligo County Council · Lodged 11 February 2022

Reference
2247
Authority
Sligo County Council
Register status
Decided
Type
RETENTION
Received
11 February 2022
Residential units
3
Floor area
37 m²

Summary

AI-generated

The application seeks retention for an existing first-floor attic conversion to habitable rooms with roof lights. It also requests permission for a new 35 square metre flat-roof extension to the rear, dormer window replacements, and elevational changes.

Extensionattic conversionextensiondormer

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Development consisting of the following works
  • Retention of existing first floor attic conversion from storage to habitable rooms along with 3 roof lights to front and 1 one rear
  • Replace 2 no. Existing velux windows to the rear with 2 flat roof dormers with windows suitable for escape and rescue
  • Include one additional velux window to front
  • Construction of a flat roof extension to rear of house 35m2 floor area
  • Elevational changes to existing south side gable to form new window and door opening for access to newutility room along with all associated site works

Land-use zoning

What this land is zoned for

RV – rural village usesRU
Objective: To protect the character of the village, ensuring that local housing needs are appropriately addressed, physical and community infrastructure is maintained and improved, and local services can continue to be provided.

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Sligo County Development Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 April 2023.

Notified floor area: 35

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
21 Kingsfort Manor, Ballintogher, SligoApr 2025€330,000151 m
16 Kingsfort Manor, Ballintogher, SligoSept 2025€239,500159 m
Tiratick, Ballintogher, Co. SligoDec 2025€80,000168 m
Teratick House, Ballintogher, County SligoSept 2025€310,000197 m
Ballintogher, County SligoMay 2025€35,000197 m
26 Kingfort Manor, Ballintogher, SligoOct 2025€290,000201 m
28 Kingsfort Manor, Ballintogher, SligoMay 2026€286,000215 m
29 Kingsfort Manor, Ballintogher, SligoJan 2025€285,500215 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 February 2022
  2. Decision due7 April 2022
  3. Decision issued6 April 2022
  4. Grant issued13 May 2022
  5. Permission expiry12 May 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.