Planning Permission Ireland
GrantedExtensionDecided 10 May 2023

Main Street, Ballisodare, Co. Sligo

Demolition of a rear extension and construction of a new larger rear extension at a beauty salon in Ballisodare.

2360051 · Sligo County Council · Lodged 22 March 2023

Reference
2360051
Authority
Sligo County Council
Register status
Decided
Type
PERMISSION
Received
22 March 2023

Summary

AI-generated

The application seeks to demolish an existing 27.2 sqm flat roof extension to the rear of a beauty salon. It proposes constructing a new 211.5 sqm rear extension, including alterations and refurbishments to the building, which is registered as a Building of Note.

Extensionextensioncommercialdemolitionheritage
Floor area
212 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Application for planning permission to (1) demolish existing flat roof extension to the rear of existing beauty salon premises (total floor area 27.2sq. M, (2) construct new rear extension (total floor area 211.5sq. M) including the carrying out of all necessary alterations and refurbishments accommodating the proposed works; (3) carry out all associated ancillary site works including connections to existing services at main street, ballisodare, co. Sligo. Relevant building is registered as building of note bon no. 1 in ballysadare mini-plan

Land-use zoning

What this land is zoned for

MIX – mixed usesRE
Objective: Promote the development of a dynamic mix of uses able to create and sustain viable town and village centres. Commercial (including retail), residential, leisure, community, office and suitable enterprise uses are supported in mixed-use zones,

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Sligo County Development Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 75, Block 10, Ballisodare Town CentreJan 2026€2,155,00036 m
Apartment 88, Block 11, Ballisodare Town CentreJan 2026€1,200,00059 m
Apartment 52 Block 6, Ballisodare Town Centre, Station Road BallisodareJan 2026€1,045,00076 m
47 Fairgreen Square, Ballisodare Town Centre, BallisodareJan 2026€305,000134 m
23 Fairgreen Square, Ballisodare, Co SligoOct 2025€260,000163 m
Carragubada, Ballisadare, SligoJan 2025€130,000192 m
Apartment 5, Ard Cuan, Ballisodareprice excludes VATApr 2026€220,575192 m
Apartment 6, Ard Cuan, Ballisodareprice excludes VATMay 2026€233,945192 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 March 2023
  2. Decision due16 May 2023
  3. Decision issued10 May 2023
  4. Grant issued14 June 2023
  5. Permission expiry13 June 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.