Planning Permission Ireland
Exempt — no permission neededChange of useDecided 18 July 2017

Site 14 A1, Greenogue Business Park, Rathcoole, Co. Dublin.

Section 5 declaration for accepting and storing air pollution control residue at a waste facility in Rathcoole.

ED17/0034 · South Dublin County Council · Lodged 21 June 2017

Reference
ED17/0034
Authority
South Dublin County Council
Register status
In progress
Type
Declaration of Exemption Section 5
Received
21 June 2017

Summary

AI-generated

A Section 5 declaration of exemption is sought to accept, package, and temporarily store air pollution control residue (APCR) before export. The hazardous material will be handled within existing waste limits at the Greenogue Business Park facility.

Change of usewaste managementhazardous wasteindustrial
Floor area
5,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Rilta environmental ltd. Operates a waste transfer station for the handling of hazardous and non-hazardous wastes at site 14a geeenogue business park under planning permission sd02a/0301. The site encompasses 0.5ha and comprises a main warehouse, hazardous chemical store, offices, three covered tanker bays, a covered dispatch area and a weighbridge. The current permission authorises the acceptance, storage and packaging of 60,000 tonnes of waste comprising 27,000 tonnes of non-hazardous, commercial and industrial, construction and demolition wastes, sewage and industrial sludges, and 33,000 tonnes of hazardous waste. Rilta intends to accept, package and temporarily store air pollution control residue (apcr), before exporting it for disposal. This material will be classified as hazardous and the annual acceptance rate will be 30,000 tonnes. Apcr will make up the bulk of the 33,000 of the currently authorised hazardous waste, and it is not proposed to increase either the quantity of hazardous waste (33,000) or the overall quantity of waste (60,000 tonnes) that is currently approved. There will be no change to the waste acceptance and handling procedures. All wastes will continue to be off-loaded, packaged and stored inside the main warehouse and will not be visible from any public road contiguous or adjacent to the curtilage of the building. It is not proposed to change the operational hours and, as the apcr will replace the other hazardous wastes already approved,there will be no increase in traffic movements to and from the facility.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received21 June 2017
  2. Decision due18 July 2017
  3. Decision issued18 July 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.