Planning Permission Ireland
Exempt — no permission neededIndustrialDecided 7 January 2026

Stericycle Waste Treatment Facility, Unit 430, Beech Road, Western Industrial Estate, Dublin, D12 X361

Installation of a new air emissions abatement system at a waste treatment facility.

ED25/0099 · South Dublin County Council · Lodged 30 October 2025

Reference
ED25/0099
Authority
South Dublin County Council
Register status
Decided
Type
Declaration of Exemption Section 5
Received
30 October 2025

Summary

AI-generated

The proposed development involves replacing an outdated air emissions abatement unit with a new system. This upgrade is required by the EPA to ensure compliance with the facility's waste licence regarding volatile organic compound emissions.

Industrialindustrialenvironmentalupgrade

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development involves the installation of a new air emissions abatement system to replace the existing, outdated unit. This upgrade is necessary to ensure compliance with condition 5 of the facility's waste licence (ref: w0055-02), which mandates the removal of volatile organic compounds (vocs) from site emissions prior to atmospheric discharge. The current abatement unit is no longer capable of maintaining voc emission levels within the limits specified in schedule b of the waste licence. The installation of the new system is a corrective action required by the environmental protection agency (epa) to address this compliance issue.

Land-use zoning

What this land is zoned for

REGENRE
To facilitate enterprise and/or residential led regeneration

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received30 October 2025
  2. Decision due21 January 2026
  3. Decision issued7 January 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.