Montpellier, Bohernabreena, Dublin 24
Revised design for a four-bedroom bungalow with a new entrance and treatment system.
SD04A/0749 · South Dublin County Council · Lodged 24 June 2005
- Reference
- SD04A/0749
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 24 June 2005
- Residential units
- 1
- Floor area
- 310 m²
Summary
AI-generatedThe application seeks permission for a revised four-bedroom bungalow design with a reduced floor area and the omission of a granny flat. It also includes a new recessed vehicular access and a new effluent treatment system.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Revised four bed bungalow (reduced in floor area and granny flat omitted), new recessed vehicular access and a new effluent treatment system and all associated site works.
Land-use zoning
What this land is zoned for
“To protect and enhance the outstanding natural character of the Dublin Mountains Area”
National zoning type: Conservation, amenity or buffer space, corridor/belt, landscape
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Friarstown, Bohernabreena, Dublin | Jun 2026 | €500,000 | 279 m |
| Mountpelier, Bohernabreena, Tallaght | Sept 2025 | €581,000 | 491 m |
| Mount Pellier, Bohernabreena, Dublin 24 | Jul 2025 | €400,000 | 496 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received24 June 2005
- Further information requested29 November 2004
- Further information received2 March 2005
- Decision due19 July 2005
- Decision issued21 July 2005
- Permission expiry15 March 2005
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Withdrawn40 m away
Dormer bungalow, secondary effluent treatment system, combined recessed entrance and driveway to be shared…
Mountpelier, Bohernabreena, Dublin 24
SD03A/0176South DublinLodged 27 Mar 2003New dwelling
- Refused80 m away
Private dwelling and septic tank
Mountpelier, Bohernabreena, Tallaght, Dublin 24
SD03A/0216South DublinLodged 14 Apr 2003New dwelling
- Granted80 m away
Change of house plans and alterations to site layout from dormer style private dwelling with septic tank to…
Mountpelier, Bohernabreena, Tallaght, Dublin 24
SD03A/0963South DublinLodged 13 May 2004Alterations
- Granted90 m away
2-storey 4 bed dwelling, detached double garage and waste water treatment system and all associated site works
Montpellier, Bohernabreena, Dublin 24
SD06A/0157South DublinLodged 2 Jun 2006New dwelling
- Withdrawn90 m away
Dormer bungalow, secondary effluent treatment system, combined recessed entrance and driveway to be shared…
Mountpelier, Bohernabreena, Dublin 24
SD03A/0177South DublinLodged 27 Mar 2003New dwelling
- Refused100 m away
Demolish the existing extension to the side and rear of the existing cottage and replace with a two storey…
Cornaon Cottage, Montpellier, Bohernabreena, Dublin 24
SD19B/0486South DublinLodged 14 Apr 2020Extension
- Refused100 m away
Removal of 2 no. existing sheds from site — removal of existing septic tank
Cornaon Cottage, Montpellier, Bohernabreena, Dublin 24
SD08A/0864South DublinLodged 23 Dec 2008New dwelling
- Granted100 m away
Planning permission was granted on the site under SD19B/0486 & ABP-307604-20 for a two storey dormer…
Cornaon Cottage, Montpellier, Bohernabreena, Dublin 24
SD21B/0523South DublinLodged 11 Oct 2021Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedNew dwelling
The demolition of an existing dwelling/garage and the construction of a new 4 bedroom bungalow, effluent…
Ovidstown , Donadea , Naas
23444KildareLodged 27 Apr 2023
- Awaiting decisionExtension
Renovation of an existing bungalow house with new single storey living area extension to the rear of the…
Moortown , Rathcoffey , Naas
23281KildareLodged 21 Mar 2023
- GrantedNew dwelling
Construction of a 4 bed bungalow with waste water treatment system, sub-division of existing site closing and…
High Road, Bohernabreena, Dublin 24
SD08A/0433South DublinLodged 25 Jun 2008
- RefusedNew dwelling
Single storey 4 bed bungalow with effluent waste water treatment unit, widening of existing vehicular access…
Athgoe North, Newcastle, Co. Dublin.
SD07A/0434South DublinLodged 11 Jun 2007
- GrantedNew dwelling
The demolition of an existing bungalow dwelling, decommission of existing treatment system, construction of…
Ballymore Goolds Cross , Cashel , Co. Tipperary
2560635TipperaryLodged 3 Jul 2025
- Awaiting decisionNew dwelling
The construction of a detached single storey bungalow, modifications to existing recessed entrance, secondary…
Longstone , Ballymore Eustace , Co. Kildare.
20536KildareLodged 29 May 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.