Planning Permission Ireland
GrantedIndustrialDecided 12 May 2006

Mulcahy Keane Industrial Estate, Greenhills Road, Walkinstown, Dublin 12.

Partial roof demolition, asbestos removal, and roof replacement at a Walkinstown industrial estate.

SD06A/0195 · South Dublin County Council · Lodged 20 March 2006

Reference
SD06A/0195
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
20 March 2006

Summary

AI-generated

Partial demolition of the existing Northright roof structure, including the controlled removal and disposal of asbestos roof sheeting. The roof will be replaced with a new duopitch structure.

Industrialasbestosroof replacementdemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Works to partially demolish the existing northright roof structure (incorporating controlled removal and disposal of existing asbestos roof sheeting in accordance with the requirements of the health & safety authority and the european communities (protection of workers) (exposure to asbestos) regulations 1989) and replace with duopitch roof structure.

Land-use zoning

What this land is zoned for

REGENRE
To facilitate enterprise and/or residential led regeneration

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 St Peters Rd, Walkinstown, Dublin 12Dec 2025€581,000103 m
11 Greenhills Road, Walkinstown, Dublin 12Mar 2026€635,000131 m
61 St Peters Rd, Walkinstown, Dublin 12May 2026€705,000164 m
73 St Peters Rd, Walkinstown, Dublin 12May 2026€523,000188 m
47 Cherryfield Rd, Walkinstown, Dublin 12Jun 2025€585,000197 m
17 Cherryfield Rd, Walkinstown, Dublin 12Nov 2025€610,000198 m
51 Cherryfield Rd, Walkinstown, Dublin 12Mar 2026€550,000200 m
5 Cherryfield Road, Walkinstown, Dublin 12May 2025€550,000218 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 March 2006
  2. Decision due14 May 2006
  3. Decision issued12 May 2006
  4. Grant issued22 June 2006

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.