Planning Permission Ireland
WithdrawnAlterationsDecided 4 December 2006

11C, Parkmore Industrial Estate, Longmile Road, Dublin 12.

Subdivision of an industrial unit into four smaller units in Dublin 12.

SD06A/0212 · South Dublin County Council · Lodged 24 March 2006

Reference
SD06A/0212
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
24 March 2006
Floor area
32 m²

Summary

AI-generated

The application seeks to divide an existing industrial unit into four smaller units. Works will include three new internal party walls, modifications to ground and first-floor layouts, external changes to the front elevation including three new gate accesses, and new sewer connections.

Alterationsindustrialsubdivisionrenovation
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The division of 11c parkmore industrial estate, longmile road, dublin 12 into four smaller industrial units. Internally, three new party walls and modifications to the existing ground and first floor layouts. Externally modifications to the front elevation will include the addition of three new gate accesses, addition, modifications and deletion of window and door openings. Also works will include two new connections to the existing private sewer.

Land-use zoning

What this land is zoned for

REGENRE
To facilitate enterprise and/or residential led regeneration

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Robinhood Park, Clondalkin, Dublin 22Aug 2025€176,000261 m
1 Walkinstown Avenue, Walkinstown, Dublin 12Nov 2025€485,000315 m
79 Walkinstown Dr, Walkinstown, Dublin 12Jul 2025€410,000412 m
123 Walkinstown Drive, Walkinstown, Dublin 12Jun 2026€430,000416 m
34 Walkinstown Ave, Walkinstown Dublin 12, DublinDec 2025€400,000420 m
127 Walkinstown Dr, Walkinstown, Dublin 12Jun 2026€480,000426 m
42 Walkinstown Park, Walkinstown, Dublin 12Jun 2025€495,000438 m
139 Walkinstown Dr, Dublin 12, DublinMar 2026€460,000459 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 March 2006
  2. Further information requested16 May 2006
  3. Decision due21 April 2006
  4. Decision issued4 December 2006
  5. Application withdrawn4 December 2006

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.