Planning Permission Ireland
Part granted, part refusedChange of useDecided 9 November 2006

3, Main Street, Tallaght, Dublin 24.

Change of use from opticians to office space and construction of a two-storey rear extension.

SD06A/0796 · South Dublin County Council · Lodged 15 September 2006

Reference
SD06A/0796
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
15 September 2006
Floor area
34 m²

Summary

AI-generated

The application seeks to change the use of the existing building from an opticians to office space. It also includes building a two-storey rear extension of 33.6 sq.m. containing two offices, with an open yard and entrance doors onto a back lane.

Change of useofficeextension
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for (a) change of use of existing building from opticians to office space, (b) erection of two storey extension to the rear of existing building of 33.60sq. M. With ridge height lower than existing building. The proposed extension contains two number offices with open yard bound with black walls & entrance doors onto back lane.

Land-use zoning

What this land is zoned for

VCUC
To protect, improve and provide for the future development of Village Centres

National zoning type: City/Town/village Centre, central area

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 April 2023.

Notified floor area: 69

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
31 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Aug 2025€330,000201 m
74 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Nov 2025€300,000203 m
76 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Sept 2025€263,000203 m
61 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24May 2026€326,000208 m
60 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Feb 2025€336,000208 m
62 New Bancroft Hall, Tallaght, Dublin 24May 2025€336,000208 m
77 New Bancroft Hall, Tallaghtprice excludes VATFeb 2025€281,000209 m
6 Bellvue Apartment, Cookstown, TallaghtOct 2025€195,000219 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 September 2006
  2. Decision due8 November 2006
  3. Decision issued9 November 2006
  4. Grant issued18 December 2006

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.