Unit 504-1, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin
Converting an industrial unit into a tool hire, storage, and distribution depot with a new mezzanine floor.
SD07A/0419 · South Dublin County Council · Lodged 5 June 2007
- Reference
- SD07A/0419
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 5 June 2007
- Floor area
- 289.2 m²
Summary
AI-generatedThe project involves installing a 289.2 square metre mezzanine floor and a wash bay to establish a tool hire and distribution depot. It also includes creating a repair workshop, canteen, transport office, reception showroom, and installing a palisade fence.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Installation of mezzanine floor(289.2 square metres), internal refurbishment and installation of wash bay (4.3 x 4.1 metres) to form tool hire, storage and distribution depot; internal alterations to premises to form repair workshop (165 square metres), canteen (14 square metres), transport office (9.57 square metres) and reception/showroom (46.75 square metres); installation of fire exit door, new double door entrance, gas storage cage (3.5 x 2.0 metres) and erection of palisade fence (2.4 metres high).
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received5 June 2007
- Decision due30 July 2007
- Decision issued30 July 2007
- Grant issued11 September 2007
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Revised site plan, site boundaries, boundary footprint, floor plans and elevations for the construction of 2…
Site 504, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD05A/0974South DublinLodged 5 Dec 2005Industrial
- Granted90 m away
Revised site plan, building footprint, floor plans & elevations comprising of the construction of a tyre…
Site 504, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD05A/0228South DublinLodged 5 Apr 2005Industrial
- Granted90 m away
Permission for revised site plan, building footprint, floor plans & elevations comprising the construction of…
Site 503N, Greenogue Industrial Estate, Rathcoole, Co. Dubllin.
SD06A/0510South DublinLodged 20 Jun 2006Industrial
- Granted90 m away
Revised site plan,building footprint, floor plans and elevations comprising the construction of 2 no.…
Site 503 (north), Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD05A/0591South DublinLodged 19 Jul 2005Industrial
- Granted100 m away
Retention of 657sq.m mezzanine floor within existing warehousing unit providing 595sq.m warehouse storage…
Unit 502 A, Grants Row, Greenogue Business Park, Rathcoole, Co. Dublin
SD19A/0190South DublinLodged 14 Jun 2019Retention
- Granted110 m away
The amalgamation of two existing industrial buildings (Unit 502B and Unit 502C), including ancillary offices,…
Unit 502 B & C, Grants Row, Greenogue Business Park, Rathcoole, Dublin, D24 WA49
SD25A/0275WSouth DublinLodged 13 Nov 2025Industrial
- Granted110 m away
Change of use from warehouse/storage to a micro-distillery for the production of gin and whiskey
Unit 64, Block 503, Greenogue Business Park, Rathcoole, Co. Dublin
SD17A/0170South DublinLodged 10 Aug 2017Change of use
- Granted110 m away
Construct 98,252m.sq. of industrial/warehousing units in 20 no. blocks (varying from 8 to 17m high) including…
Blundelstown, Collegeland, Greenogue &, Westmanstown, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD03A/0066South DublinLodged 23 Jun 2003Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionAlterations
The Installation of a new mezzanine floor including internal stairs within the existing warehouse/light…
Zone A , Mullingar Business Park , Mullingar
2660293WestmeathLodged 3 Jun 2026
- GrantedCommercial
Construction of a 134sqm mezzanine floor within the premises which is presently used for…
Unit 18d Euro Business Park, Courtstown, Little Island, Co.Cork
154550corkLodged 23 Mar 2015
- GrantedCommercial
The construction of a new first floor mezzanine to the existing retail warehouse consisting of — Additional…
Retail Warehouse Unit No.2, Eastgate Retail Park, Eastgate, Castleview, Little Island, Co. Cork
214420corkLodged 22 Feb 2021
- GrantedAlterations
Alterations and extension to the existing mezzanine floor of 538sq.m to provide an overall mezzanine floor of…
Unit 1, The Retail Park, Liffey Valley, Coldcut Road, Dublin 22
SD20A/0252South DublinLodged 8 Oct 2020
- GrantedChange of use
Partial change of use of ground floor of existing warehouse into a Display/Trade Sales area (72sq m).…
Unit 19 Euro Business Park, Courtstown, Little Island, Co.Cork,
176790corkLodged 27 Oct 2017
- GrantedCommercial
To (a) construct extensions to existing unit comprising of a workshop, reception area, meeting room & store,…
Unit 1 Castlepark , Smithstown , Co Clare
20807ClareLodged 3 Nov 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.