Planning Permission Ireland
GrantedIndustrialDecided 29 August 2007

Site 643, Greenogue Industrial Estate, Rathcoole, Co. Dublin

Establishment of a waste recycling and recovery facility processing up to 45,000 tonnes of waste per year.

SD07A/0528 · South Dublin County Council · Lodged 5 July 2007

Reference
SD07A/0528
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
5 July 2007
Floor area
684 m²

Summary

AI-generated

The application seeks to amend a previously permitted warehouse scheme to establish a waste recycling and recovery facility. The facility will process up to 45,000 tonnes of waste annually, including hydrocarbon contaminated waste, industrial process waste, and oil-contaminated solids, alongside short-term storage of contaminated soils.

Industrialwaste managementindustrialrecycling

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amend a previously permitted scheme (sd06a/0035) on this site of approx. 0.41 ha. (the original permission permits a warehouse building [530sqm] with yard for the purposes of storage/transhipment of goods associated with the warehouse use). Development now proposed consists of a waste recycling and recovery facility for the processing of up to 45,000 tonnes of waste per annum, consisting of three waste streams namely: hydrocarbon contaminated waste (including interceptor waste, oily water, waste oil, coolants, cutting fluids, fuel oils and tank bottoms); process/industrial wastes (including drain cleaning waste, acid/alkaline waste, neutralized waste, lime sludge leachate, process wash waters and bilge waste) and oil-contaminated solid materials (including spent oil filters and oily rags). It is also proposed that the facility be used for the short term storage of contaminated soils in skips and bulk bags at quantities not exceeding 1,000 tonnes per annum. The proposed development also consists of the completion of the concreting and bunding of the existing yards (which are partially already concreted and bunded) for purposes associated with the waste recycling and recovering facility; the provision of 4 no. External bunded storage tanks; internal alterations to provide for a kitchen (9sqm), changing and wash room (13sqm) and control room (15sqm) at ground floor level and the addition of a laboratory at first floor level (14sqm) in the existing building giving a total floor area of 565sqm (including stair cores and circulation space) which is now to be used primarily for the processing and treatment of waste; 2 no. Separate extensions to the east of the existing building, the first being approx. 36m long, 18.9m wide by 9.55m high (650sqm), into which deliveries of unprocessed waste (into 3 no. Underground sumps) are to be made (prior to pumping into 3 no. Above-ground storage tanks), and the second extension being approx. 5.4m long, 7.5m wide by 8.4m high (36sqm), to be used for the short term storage of unprocessed waste in bulk containers and empty containers prior to removal off site. Both the proposed extensions are to match the existing building in external finish. The development also includes the provision of 1 no. Weighbridge; 1 no. Wash bay; 11 no. Car parking spaces; modifications to the existing surface and foul drainage; landscaping; the demolition of 7.25m of existing rendered block wall for the purposes of widening an internal entrance within the site, and all other necessary site development and excavation works above and below ground. The application relates to development which comprises and is for the purposes of an activity requiring a waste license in accordance with the waste management act, 1996. An environmental impact statement (eis) will be submitted to the planning authority with the application.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received5 July 2007
  2. Decision due5 July 2007
  3. Decision issued29 August 2007
  4. Grant issued10 October 2007

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.