11, Limekiln Park, Dublin 12
Retention of a first-floor dormer extension with a bathroom and rooflight.
SD07B/0618 · South Dublin County Council · Lodged 18 July 2007
- Reference
- SD07B/0618
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Retention
- Received
- 18 July 2007
Summary
AI-generatedThis application seeks retention permission for a first-floor dormer extension. The extension consists of a bathroom with a rooflight to the rear of the dwelling.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
First floor dormer extension, consisting of a bathroom with a rooflight to rear of dwelling.
Land-use zoning
What this land is zoned for
“To protect and/or improve residential amenity”
National zoning type: Existing residential
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 2 Limekiln Park, Manor Estate, Dublin 12 | May 2026 | €680,000 | 76 m |
| 30 Limekiln Park, Dublin 12, Dublin | Apr 2025 | €550,000 | 89 m |
| 21 Mountdown Park, Manor Estate, Dublin 12 | Jun 2026 | €635,000 | 91 m |
| 42 Limekiln Rd, Perrystown, Dublin 12 | Jul 2025 | €575,000 | 152 m |
| 38 Limekiln Dr, Manor Estate, Dublin 12 | Jun 2026 | €638,000 | 177 m |
| 1 Temple Manor Ave, Greenhills, Dublin 12 | Apr 2025 | €575,000 | 185 m |
| 56 Willington Dr, Templeogue, Dublin 6w | Oct 2025 | €630,000 | 197 m |
| 45 Limekiln Rd, Walkinstown, Dublin 12 | Sept 2025 | €555,000 | 199 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received18 July 2007
- Decision due11 September 2007
- Decision issued10 September 2007
- Grant issued23 October 2007
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Two-storey pitched roof rear extension, new window to side elevation and associated site works
9 Limekiln Park, Dublin 12.
SD16B/0117South DublinLodged 14 Apr 2016Extension
- GrantedAt this site
Demolition of an existing garage to side and provision of a two storey extension comprising of porch and…
7, Limekiln Park, Manor Estate, Templeogue, Dublin 12.
SD05B/0026South DublinLodged 20 Jan 2005Extension
- Granted50 m away
2 storey extension at the side and rear of the existing semi detached dormer house
21, Limekiln Park, Dublin 12
SD07B/0197South DublinLodged 12 Mar 2007Extension
- Granted50 m away
First floor dormer extension to rear and to remove flat roof on existing single storey kitchen and replace…
12, Limekiln Park, Terenure, Dublin 12.
SD03B/0515South DublinLodged 17 Oct 2003Extension
- Granted50 m away
Take down existing garage to side of house and existing extension with flat roof at rear at first floor…
14, Limekiln Park, Terenure, Dublin 12
SD03B/0505South DublinLodged 29 Sept 2003Extension
- Granted50 m away
Dormer extension and single storey extension at rear and conversion of domestic garage to study together with…
16 Limekiln Park, Terenure, Dublin 12.
S99B/0254South DublinLodged 20 Apr 1999Extension
- Granted60 m away
Retention permission for ground and dormer level extensions to rear of dwelling
20, Limekiln Park, Manor Estate, Dublin 12
SD04B/0075South DublinLodged 1 Jun 2004Retention
- Granted60 m away
Single storey extension to the side and rear of the existing dormer bungalow, a first floor dormer extension…
25, Limekiln Park, Greenhills, Dublin 24.
SD06B/0105South DublinLodged 24 Feb 2006Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedExtension
Renovation and extension of the existing first floor bathroom, and provision of a dormer window and ancillary…
110, Shrewsbury Lawn, Cabinteely, Dublin 18
D05B/0528Dún Laoghaire–RathdownLodged 7 Jul 2005
- InvalidExtension
Single storey extension to a bedroom and to the bathroom at first floor/dormer level at the rear and western…
'Rose Cottage', Lucan Road, Lucan, Co. Dublin
SD22B/0106South DublinLodged 14 Mar 2022
- GrantedExtension
Construction of a new dormer window in roof to side of existing dwelling to form new bathroom at first floor
58, Alpine Rise, Dublin 24
SD15B/0201South DublinLodged 11 Jun 2015
- GrantedExtension
Rear first floor bathroom extension over existing kitchen return with flat roof; rear dormer extension to…
38, Corbally Avenue, Westbrook Lawns, Saggart, Co. Dublin.
SD10B/0222South DublinLodged 2 Sept 2010
- GrantedExtension
Single storey extension to bedroom and to bathroom at first floor/dormer level at the rear and western end of…
'Rose Lodge', Lucan Road, Lucan, Co. Dublin
SD22B/0186South DublinLodged 3 May 2022
- GrantedExtension
First floor extension including a dormer window and velux rooflights to the side
17, Willowbank Park, Rathfarnham, Dublin 14
SD03B/0103South DublinLodged 3 Mar 2003
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.