16, Dun An Oir, Old Bawn, Tallaght, Dublin 24.
First-floor extension to the side and front of an existing semi-detached house.
SD07B/0991 · South Dublin County Council · Lodged 10 December 2007
- Reference
- SD07B/0991
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 10 December 2007
- Floor area
- 38.15 m²
Summary
AI-generatedThe project involves constructing a first-floor extension to the side and front of a two-storey semi-detached dwelling. The extension will be built above the existing sitting room, utility room, and WC/shower room, and includes window and door modifications.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
First floor extension to side and front of two storey semi-detached dwelling house, above existing sitting room, utility room and w. C. /shower room, also new window to utility room and replacement of existing front window and door to sitting room with new window.
Land-use zoning
What this land is zoned for
“To protect and/or improve residential amenity”
National zoning type: Existing residential
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 59a Watermeadow Drive, Old Bawn, Dublin 24 | Feb 2025 | €575,000 | 155 m |
| 99 Cill Cais, Oldbawn, Tallaght Dublin 24 | Jun 2026 | €430,000 | 165 m |
| 95 Cill Cais, Oldbawn, Tallaght Dublin 24 | Jul 2025 | €600,000 | 178 m |
| 28 Watermeadow Dr, Old Bawn, Tallaght Dublin 24 | Apr 2026 | €440,000 | 197 m |
| 93b Cill Cais, Old Bawn, Tallaght Dublin 24 | Aug 2025 | €475,000 | 200 m |
| 41 Watermeadow Park, Dublin 24 | Mar 2026 | €450,000 | 227 m |
| 41a Watermeadow Park, Oldbawnprice excludes VAT | Jul 2025 | €594,714 | 229 m |
| 73 Cill Cais, Old Bawn, Tallaght Dublin 24 | Dec 2025 | €390,000 | 270 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received10 December 2007
- Decision due12 February 2008
- Decision issued12 February 2008
- Grant issued26 March 2008
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Demolition of garage, 2 storey 3 bedroom detached dwelling to side with new vehicular entrance for both…
18, Dun An Oir, Old Bawn, Tallaght, Dublin 24.
SD08A/0103South DublinLodged 14 Feb 2008New dwelling
- GrantedAt this site
Demolition of garage, two storey, two bedroom detached dwelling at side with new vehicular entrance for both…
18, Dun An Oir, Old Bawn, Tallaght, Dublin 24.
SD16A/0253South DublinLodged 14 Jul 2016New dwelling
- Refused30 m away
Detached, two storey dwelling with off street parking to side
18, Dun An Oir, Old Bawn, Tallaght, Dublin 24.
SD06A/1027South DublinLodged 30 Nov 2006New dwelling
- Invalid30 m away
Detached two storey dwelling with off street parking to side
18, Dun An Oir, Old Bawn, Tallaght, Dublin 24.
SD06A/0891South DublinLodged 16 Oct 2006New dwelling
- Granted50 m away
First floor dormer extension to side with tiled roof over, also tiled canopy to front with bay window to…
23, Dun-An-Oir, Old Bawn, Dublin 24.
SD06B/0775South DublinLodged 18 Oct 2006Extension
- Granted60 m away
Demolition of existing shed in rear garden. Construction of proposed shed with pitched roof in rear garden.…
35, Dun An Oir, Old Bawn, Tallaght, Dublin 24
SD22B/0292South DublinLodged 23 Jun 2022Extension
- Granted60 m away
Two storey extension to the side of existing building
2, Dun An Oir, Old Bawn, Tallaght, Dublin 24
SD05B/0580South DublinLodged 26 Aug 2005Extension
- Granted60 m away
Construction of a single storey rear conservatory and all associated site works
2, Dun An Oir, Old Bawn, Tallaght, Dublin 24
SD10B/0292South DublinLodged 22 Jul 2010Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedExtension
Construction of first floor extension to side of existing semi-detached dwellinghouse
27 Coolroe Heights, Coolroe, Ballincollig,
0810278corkLodged 22 Dec 2008
- GrantedExtension
First floor extension above ground floor to side, new front porch and single storey extension to the rear of…
64, Windsor Drive, Monkstown, Co. Dublin.
D07A/1191Dún Laoghaire–RathdownLodged 21 Aug 2007
- GrantedExtension
First floor extension to side of existing two storey semi-detached dwelling with elevational changes to front…
1 Manor Villas, Thornbury View, Monfieldstown, Rochestown
164753corkLodged 6 Apr 2016
- InvalidExtension
Permission is sought for a first floor extension to the side of an existing 2-storey semi-detached dwelling…
131 Gaybrook Lawns, Malahide, Co. Dublin, K36 AK76
F24A/1007EFingalLodged 13 Nov 2024
- GrantedExtension
For first floor extension above existing ground floor to side and single storey extension to rear of an…
65, Windsor Drive, Monkstown, Co. Dublin
D06B/0834Dún Laoghaire–RathdownLodged 13 Sept 2006
- GrantedExtension
Construction of first floor extension to existing semi-detached dwellinghouse
No.72, Delford Drive, Rochestown Rd,Monfieldstown, Rochestown,
105162corkLodged 13 May 2010
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.