Planning Permission Ireland
Part granted, part refusedExtensionDecided 21 August 2008

50 College Park, Terenure, Dublin, 6W

A two-storey rear extension and conversion of the side garage into habitable space with a new pitched roof.

SD08B/0475 · South Dublin County Council · Lodged 30 June 2008

Reference
SD08B/0475
Authority
South Dublin County Council
Register status
Appealed
Type
Permission
Received
30 June 2008
Floor area
78.6 m²

Summary

AI-generated

This application proposes modifications and additions to an existing dwelling, including a two-storey pitched-roof rear extension. It also includes converting the existing side garage into habitable space and replacing its flat roof with a new pitched, tiled roof.

Extensionextensiongarage conversionsuburban
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Modifications and additions comprising: a two storied, pitched roof, rere extension; conversion of existing side garage to habitable space, complete with new pitched, tiled roof thereover in place of existing flat roof to match existing roof covering.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 8 July 2014. A completion certificate was lodged on 9 April 2025.

Notified floor area: 773

7 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
65 College Park, Terenure, Dublin 6wMar 2026€910,00046 m
59 College Park, Terenure Dublin 6w, DublinJul 2025€904,00053 m
142 Wainsfort Rd, Terenure, Dublin 6wJan 2025€740,00079 m
39 College Park, Terenure, Dublin 6wSept 2025€950,000112 m
37 College Park, Terenure, Dublin 6wMay 2026€935,000115 m
12 Wainsfort Crescent, Terenure, Dublin 6wMay 2025€670,000128 m
8 Wainsfort Crescent, Templeogue, Dublin 6wNov 2025€600,000136 m
157 Wainsfort Rd, Terenure, Dublin 6wJun 2026€955,000142 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 June 2008
  2. Decision due24 August 2008
  3. Decision issued21 August 2008
  4. Appeal submitted16 September 2008
  5. Appeal decided26 February 2009
  6. Permission expiry30 December 2008

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.