Behan's Quarry, Windmill Hill, Rathcoole, Co Dublin

Establishment of a waste management facility at a quarry in Rathcoole.

SD10A/0197 · South Dublin County Council · Lodged 6 July 2010

Reference
SD10A/0197
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
6 July 2010
Floor area
1120 m²

Summary

AI-generated

The development proposes a waste management facility with a maximum annual intake of 24,000 tonnes of inert waste. The materials, including concrete and gravel, will be recycled for use in the onsite tarmacadam plant and quarry haul roads.

Industrialquarrywaste managementrecycling

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The establishment of a waste management facility with a maximum intake volume of 24,000 tonnes per annum to accept inert waste material including waste bituminous mixtures (ewc 170302), waste concrete (ewc 170101) & waste gravel and crushed rocks (ewc010408) for it's recycling & reuse in the existing tarmacadam manufacturing plant located on the site and to facilitate the deposit of waste bituminous product, waste gravel and waste concrete into haul roads throughout the subject quarry site in which the subject waste facility is located. The site currently has a waste permit (waste permit no. Wpr 051/2) with a permitted volume of 500 tonnes per annum. This development requires a waste facility permit under the waste management (facility permit and registration) regulations 2007 and 2008.

Land-use zoning

What this land is zoned for

RURU
To protect and improve rural amenity and to provide for the development of agriculture

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received6 July 2010
  2. Further information requested26 August 2010
  3. Decision due3 August 2010
  4. Decision issued2 March 2011
  5. Application withdrawn2 March 2011

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.