Planning Permission Ireland
GrantedNew dwellingDecided 14 November 2013

Badger Hill, Rathcoole, Co. Dublin

Construction of a two-storey house, garage with stables, and effluent treatment system in Rathcoole.

SD13A/0188 · South Dublin County Council · Lodged 23 September 2013

Reference
SD13A/0188
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
23 September 2013
Residential units
1
Floor area
234 m²

Summary

AI-generated

The development consists of a two-storey detached dwelling, a garage with stables, and the installation of an effluent treatment system. The 2.9-hectare site will be accessed via an existing adjacent entrance.

New dwellingone off housestablesrural
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Two storey detached dwelling, garage with stables and installation of an effluent treatment system. The site will be accessed via the existing entrance of the adjacent dwelling to the east all on a site of 2.9 hectares.

Land-use zoning

What this land is zoned for

RURU
To protect and improve rural amenity and to provide for the development of agriculture

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 5 August 2015. A completion certificate was lodged on 8 December 2016.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 September 2013
  2. Decision due17 November 2013
  3. Decision issued14 November 2013
  4. Grant issued19 December 2013

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.