Planning Permission Ireland
GrantedChange of useDecided 14 October 2014

Greenhills Road Extension & Tallaght Bypass (N81), Tallaght, Dublin 24

Revisions to a development in Tallaght to convert office, crèche, and retail spaces into residential units and a relocated crèche.

SD14A/0176 · South Dublin County Council · Lodged 21 August 2014

Reference
SD14A/0176
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
21 August 2014
Residential units
32
Floor area
2805.3 m²

Summary

AI-generated

The proposal seeks revisions to a substantially constructed development. It includes converting office space to a relocated crèche and residential units in Block A, converting a crèche to residential units in Block B, and converting retail space to a residential unit in Block C.

Change of useapartmentscrècheconversion

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Revisions to previously approved and substantially constructed development (reg. Ref. Sd06a/0107 and an bord pleanala reference pl06s. 217573) to include the following: (1) block a - change of use of previously approved and constructed office use (514sq. M. ) at upper basement and (200.6sq. M. ) at ground floor level to provide for crèche use (278sq. M. ) at upper basement level (which is a relocation of the permitted crèche from block b, provision of 5 residential units comprising 2 no. 1 bed live/work units at the upper basement level and 2 no. 1 bed and 1 no. 2 bed apartments at ground floor and 15 associated storage rooms at upper basement level along with revised elevation treatment including terraces and balconies and associated site works. (2) block b - change of use from previously approved and constructed crèche use (278.2sq. M. ) at ground floor level to provide for 4 residential units comprising 2 no. 1 bed and 2 no. 2 bed along with revised elevation treatment including terraces and associated site works. (3) block c - change of use from previously approved and constructed retail use (128.0sq. M. ) at ground floor level and the provision of 1 no. 3 bed unit within the existing building envelope; change of use from previously approved office use (478sq. M. )/retail use (165sq. M. ) at first floor, second floor office use (731sq. M. ) and third floor office use (643sq. M. ) to provide for 20 residential units within the existing building envelope comprising 6 no. 1 bed, 11 no. 2 bed, 3 no. 2 bed duplex units and 5 storage rooms at each level along with revised elevation treatment including terraces and balconies, associated site works and provision of photovoltaic panels and roof lights at roof level.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 November 2015. A completion certificate was lodged on 31 May 2017.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
31 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Aug 2025€330,00067 m
60 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Feb 2025€336,00087 m
62 New Bancroft Hall, Tallaght, Dublin 24May 2025€336,00087 m
61 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24May 2026€326,00087 m
77 New Bancroft Hall, Tallaghtprice excludes VATFeb 2025€281,00088 m
74 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Nov 2025€300,000105 m
76 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Sept 2025€263,000105 m
82 Priorsgate, Block 2, Greenhills Rd Tallaght Dublin 24Jan 2025€235,000117 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 August 2014
  2. Decision due15 October 2014
  3. Decision issued14 October 2014
  4. Grant issued24 November 2014

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.