Site formerly part of St. Paul's Campus, bounded by Limekiln Lane, Greenhills Park, Temple Manor & St. Paul's School, Greenhills, Dublin 12.

Demolition of a convent building and construction of 61 residential units including houses and apartments.

SD15A/0005 · South Dublin County Council · Lodged 10 April 2015

Reference
SD15A/0005
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
10 April 2015
Residential units
61
Floor area
7957.9 m²

Summary

AI-generated

The development involves the demolition of the existing convent building and ancillary structures. In its place, 61 residential units will be constructed, consisting of 49 houses of various storeys and designs, alongside a three-storey block containing 12 apartment units. The project also includes associated drainage, landscaping, parking, and a new pedestrian/cyclist connection.

Housing estatedemolitionhousing estateapartments
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of the existing convent building and ancillary structures and the construction of 61 residential units to comprise the following : 4 three storey four bed semi-detached houses; 12 three storey four bed end terraced houses; 4 two storey four bed semi-detached houses; 4 two storey three bed semi detached houses; 6 two storey three bed end terraced houses; 18 two storey three bed mid terraced houses; 1 one and a half storey three bed detached house and 1 three storey block containing 6 two bed apartment units at ground floor level and 6 two storey three bed apartment units at first floor level, all with on curtilage/on street carparking; the above to include associated drainage works on the adjoining school lands; the construction of a new attenuation area on lands within the applicant's ownership to the south east of the adjoining school and connections to the existing services on both limekiln lane and within the temple manor development on lands taken in charge by south dublin county council; the works will also include all associated landscaping and site works, the provision of visitor carparking spaces; 1 bin store and a new pedestrian/cyclist connection to greenhills park in the north west of the site.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 22 March 2017. A completion certificate was lodged on 26 February 2019.

12 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
33 Wilkins Court, Limekiln Lane, WalkinstownMar 2025€792,00062 m
59 Wilkins Court, Limekiln Lane, Dublin 22Mar 2025€705,00080 m
6 Temple Manor Close, Greenhills, Dublin 12Oct 2025€605,000116 m
9 Temple Manor Drive, Walkinstown, Dublin 12Jan 2010€300,000144 m
Site 56 Wilkins View, Greenhills, Dublin 12Nov 2025€752,000149 m
96 St Josephs Rd, Walkinstown, DublinJun 2026€505,000184 m
6 Temple Manor Grove, Limekiln, Dublin 12Dec 2025€667,000206 m
80 St Josephs Rd, Greenhills, Walkinstown Dublin 12Dec 2025€480,000215 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 April 2015
  2. Further information requested26 February 2015
  3. Further information received10 April 2015
  4. Decision due7 May 2015
  5. Decision issued30 April 2015
  6. Grant issued8 June 2015

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.