Planning Permission Ireland
RefusedInfrastructureDecided 29 September 2015

AMNCH, Tallaght Hospital, Tallaght, Dublin 24.

Installation of telecommunications antennas and equipment on the roof of Tallaght Hospital.

SD15A/0241 · South Dublin County Council · Lodged 11 August 2015

Reference
SD15A/0241
Authority
South Dublin County Council
Register status
Appealed
Type
Permission
Received
11 August 2015

Summary

AI-generated

The development consists of installing 6 telecommunications antennas, associated RRU units, 2 link dishes, and ancillary equipment on the existing rooftop of Tallaght Hospital. Equipment cabinets will also be located in the existing lift shaft equipment room to improve Vodafone's 3G and 4G networks.

Infrastructuretelecomshospitalinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • 6 telecommunications antennas, associated rru units, 2 link dishes and associated ancillary equipment on existing rooftop, including ancillary site works and proposed equipment cabinets located in existing lift shaft equipment room under, at tallaght hospital, (the adelaide and meath hospital, dublin), tallaght, dublin
  • The development will form part of vodafone ireland ltd. ’s existing gsm and 3g broadband telecommunications network, and provide improved services on their 3g / 4g broadband networks

Land-use zoning

What this land is zoned for

TCUC
To protect, improve and provide for the future development of Town Centres

National zoning type: City/Town/village Centre, central area

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 December 2018. A completion certificate was lodged on 7 September 2020.

Notified floor area: 3,019.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
737 Virginia Heights, Tallaght, Dublin 24Feb 2025€406,000207 m
33 Alderwood Green, Springfield, Tallaght Dublin 24Jul 2025€365,000223 m
725 Virginia Heights, Springfield, Tallaght Dublin 24Oct 2025€381,000268 m
29 Alderwood Close, Tallaght, DublinAug 2025€320,000274 m
59 Exchange Hall, Belgard Sq, Tallaght Dublin 24Oct 2025€280,000274 m
90 Exchange Hall, Belgard Sq, Tallaght Dublin 24May 2025€185,000274 m
56 Exchange Hall, Belgard Sq North, Tallaght Dublin 24May 2026€260,000274 m
Apt 91 Exchange Hall, Belgard Square, TallaghtMay 2026€235,000274 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 August 2015
  2. Decision due5 October 2015
  3. Decision issued29 September 2015
  4. Appeal submitted22 October 2015
  5. Appeal decided2 March 2016
  6. Permission expiry22 February 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.