Dodder Greenway Route Scheme
Development of a 14km greenway route from Terenure to Glenasmole.
SD178/0003 · South Dublin County Council · Lodged 22 June 2017
- Reference
- SD178/0003
- Authority
- South Dublin County Council
- Register status
- In progress
- Type
- Application Under Part 8
- Received
- 22 June 2017
Summary
AI-generatedThis Part 8 application proposes the Dodder Greenway Route Scheme, a 14km walking and cycling route. It will connect Orwell/Terenure through Tallaght to the Bohernabreena reservoirs, utilizing a shared 3-4m wide bound surface.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Dodder greenway route scheme comprising: the proposed dodder greenway is being developed to be a greenway of international renown and to be on a par with the best greenways in the world. Although developed as a combination of off road and on road it utilises existing facilities within the dodder valley as much as possible to connect the linear parkland along the route. The main elements of the proposed greenway are as follows
- The greenway route is approximately 14km in length and passes along the dodder valley from orwell / terenure through the outer suburbs of tallaght to rural and upland dublin to the entrance to the bohernabreena reservoirs at glenasmole
- It will provide for improved connectivity to communities, facilities and local business along the dodder valley corridor with a dedicated signage strategy
- Where commuting currently exists and demand is anticipated to continue, the scheme either ensures it is facilitated in a pedestrian priority environment with additional capacity for safe use at junctions or provide an alternative route for commuting cyclists where required
- The greenway will generally consist of a shared 3-4m wide bound surface on the off road sections, tying into suitable bound surfacing for the on road sections. It is proposed to utilise enhanced variations to reflect local context
- Works will include widening and upgrade to existing paths, construction of new paths, the construction of a number of new bridges, upgrade of existing bridges and underpasses, junction upgrades, etc
- The upgrade and creation of new entrances to the greenway
- Improved landscape treatment to provide a coherent and legible greenway along the proposed greenway
- Ecological enhancements including species rich grassland management, the planting of native trees and the provision of bat boxes
- Bat friendly public lighting will be provided both in new areas and in upgrading sections of existing lighting
- Cctv will be provided at a number of locations including each of the bridges
- Drainage measures including swales, signage, markings and ancillary works. The proposed works will comprise the following: bohernabreena to old bawn road
- Upgrade of existing entrances to proposed greenway
- Improved environment for pedestrians and cyclists in a traffic calmed environment within bohernabreena car park
- Re-alignment of the entrance within the curtilage of bohernabreena reservoir a protected structure, map reference no. 395
- Provision of traffic calming measures to cross the r114 into kiltipper park, at ellensborough
- Utilise existing shared surface through kiltipper park
- Introduction of a new car park adjacent to kiltipper woods care centre. To minimise surface water runoff from this area the car park will be constructed using a geocell type product with gravel infill
- Shared street on access road to kiltipper woods care centre
- Roundabout upgrade of existing roundabout on kiltipper way and kiltipper road junction
- Revise road cross section between kiltipper road roundabout to kiltipper woods care centre access road. Road width to be narrowed to 6m with 2m cycle track and 2m footpath
- Revise road cross section between kiltipper woods care centre and old bawn road. Road to be narrowed to 6m with provision of pedestrian facilities and traffic calming measures
- Upgrade to existing public lighting where required
- Incorporation of landscape plans and planting along greenway to further detail dodder valley park to m50 underpass
- Upgrade of existing entrances to proposed greenway
- Widen existing paths to 3.5-4m where possible to create shared surface. Widen path at edge furthest from river
- New 4m wide bridge over dodder river at the bolbrook enterprise centre and construct new 4m wide path to access road
- Link path to mount carmel park and change estate road to shared street
- Upgrade junction geometry at firhouse road/ballycullen road junction
- Existing underpass under m50 motorway to be upgraded and re-graded
- Paths through parklands to include swales
- New public lighting directed away from river edge
- This section of the route passes through a pnha (proposed natural heritage area)
- Incorporation of landscape plans and planting along greenway to further detail m50 underpass to firhouse road
- Upgrade of existing entrances to proposed greenway
- Widen existing paths to 3.5-4m where possible to createshared surface
- Create linkages to the firhouse road with upgrade of entrance and new toucan crossing of firhouse road
- Paths through parklands to include swales at certain locations
- New public lighting
- Realignment of existing paths at spa link road underpass
- Extension of existing car park at cherryfield
- Incorporation of landscape plans and planting along greenway to further detail firhouse road to kilvere
- Upgrade of existing entrances to proposed greenway
- Reconfigure geometry of firhouse road/old bridge road junction including removing the existing left slip lane off old bridge road onto butterfield avenue
- Revise road cross section from firhouse road/old bridge road junction to kilvere. Road width to be narrowed to 6m with 2m cycle track and 2m footpath. On street parking to be removed along butterfield avenue
- Shared street through kilvere to dodder valley park entrance
- Upgrade to existing public lighting where required
- Upgrade of existing entrances to proposed greenway
- Upgrade of existing cycle and pedestrian facilities on firhouse road
- Incorporation of landscape plans and planting along greenway to further detail kilvere to springfield avenue
- Upgrade of existing entrances to proposed greenway
- Widen existing paths to 3.5-4m where possible to create shared surface
- New 4m wide bridge over dodder river at riverside cottages, which is an architectural conservation area, and construct 4m wide path linking to roadway and link to existing footpath to north of river, upgrading shared street from riverside cottages to templeogue
- Path to ramp up to springfield avenue to link with a shared surface and an alternative narrower path is to join in with the existing underpass
- Upgrade to existing public lighting where required
- New public lighting within park area
- Incorporation of landscape plans and planting along greenway to further detail. Springfield avenue to rathfarnham road junction
- Upgrade of existing entrances to proposed greenway
- Reduce carriageway width down to 6.5m and form a 4m wide shared surface along the northern side of the carriageway. The existing footpath, cycle track and shared surface along the southern side of the carriageway is to be retained
- New paths and toucan crossing at fairways junction
- Upgrade existing car parking at owendoher river
- New 4m wide bridge over dodder river at bushy park, the bridge is to connect directly into the park north of existing wall where required. Provide path linkage from new path to existing paths along southern side the river
- New car park opposite the bridge location, in open space adjacent to springfield avenue
- New toucan crossing across springfield avenue
- New 4m wide shared path through green area at woodview cottages and shared street along on church lane to rathfarnham main street
- Upgrade to existing public lighting where required
- Incorporation of landscape plans and planting along greenway to further detail. Rathfarnham road junction
- Upgrade of existing entrances to proposed greenway
- Revised junction geometry to improve pedestrian and cycle facilities
- Widen springfield avenue and dodder park road approaches to the junction to facilitate the junction upgrade
- Upgrade to existing public lighting where required
- Incorporation of landscape plans and planting along greenway to further detail. Rathfarnham road junction to orwell park
- Upgrade of existing entrances to proposed greenway
- Upgrade of shared street along dodder road lower adjacent to park area at junction
- Existing shared surface along the river to be maintained and upgraded as necessary
- New 4m wide bridge over dodder river at orwell park
- Upgrade of existing pathways to allow tie in to orwell park
- Upgrade to existing public lighting where required
- Incorporation of landscape plans and planting along greenway to further detail the proposed greenway will be subject to a landscape plan, signage plan and ecological and environmental enhancements for the proposed greenway route. All ancillary works are included in the proposals. Plans and particulars of the proposed scheme will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy from thursday 22nd of june to friday 18th of august at the following locations
- South dublin county council offices, county hall, tallaght, dublin 24 between the hours of 9:00am
- 5.00pm monday to thursday and 9.00am
- 4.30pm on friday (inspection only) between the hours of 9:00am
- 4.00pm monday to thursday and 9.00am
- 3.30pm on friday (inspection and purchase)
- County library, tallaght, dublin 24, between the hours of 9.45am to 8.00pm mon to thurs, 9.45am to 4.30pm fri to sat. Closed saturdays and mondays of bank holiday weekends (inspection only)
- Ballyroan library, orchardstown avenue, rathfarnham, dublin 14, between the hours of 9:45am
- 8.00pm mon to thurs, 9.45am
- 4.30pm fri to sat. Closed saturdays and mondays of bank holiday weekends (inspection only)
- Dublin city council offices, wood quay, dublin 8 between the hours of 9:00am
- 5.00pm monday to friday (inspection and purchase). An ecological impact assessment report has been prepared in respect of the proposed works. The proposed scheme has undergone appropriate assessment screening under the habitats directive (92/43/eec) and environmental impact assessment screening under the eia directive 2014/52/eu. The documents are also available to view on the council’s public consultation portal website http://consult. Sdublincoco. Ie submissions submissions and observations on the part 8 proposed dodder greenway route can be made online and in writing to the addresses below between thursday 22nd of june to friday 18th of august inclusive (excluding public holidays) as follows
- Online: at https://consult. Sdublincoco. Ie up to midnight on the friday 18th of august 2017
- By post: in writing to the senior executive officer, forward planning section, land use, planning and transportation, county hall, tallaght, dublin 24 up to 4.00pm on the friday 18th of august 2017. Only submissions received by friday 18th august 2017 and addressed as set out above, will be considered. Submissions cannot be accepted in any other format or to any other postal address. Submissions and observations should state the name, address, and where relevant the body represented. All comments including the names and addresses of those making the comments, submitted to the council in regarding the part 8 dodder greenway route will form a report to be presented to south dublin county council, and will form part of a public document
Land-use zoning
What this land is zoned for
“To protect and enhance the outstanding character and amenity of the Dodder Valley”
National zoning type: Conservation, amenity or buffer space, corridor/belt, landscape
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 26 Pine Grove, Templeogue, Dublin 16 | Mar 2025 | €430,000 | 138 m |
| Apt 1, 7 North Richmond St, Dublin 1 | Jan 2026 | €780,000 | 182 m |
| Apt 1, 6 North Richmond St, Dublin 1 | Jan 2026 | €780,000 | 182 m |
| 1 Charleville Manor, Knocklyon, Dublin16 | Aug 2025 | €514,900 | 205 m |
| 26 Cremorne, Firhouse Rd, Templeogue Dublin 16 | Mar 2025 | €770,000 | 252 m |
| 11 Cremorne, Templeogue, Dublin 16 | Jun 2025 | €811,000 | 254 m |
| 60 Lansdowne Park, Knocklyon Rd, Templeogue Dublin 16 | Dec 2025 | €875,000 | 296 m |
| 27 Landsdowne Park, Knocklyon, Dublin 16 | Sept 2025 | €851,000 | 300 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received22 June 2017
- Decision issued25 September 2017
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Refused120 m away
Telecommunications apparatus consisting of 1 no. 18m high unipole, 3 no. Vodafone antennas, 1 no. 0.3m…
Ballyboden St. Enda's GAA, Camogie and Ladies Football Club, Firhouse Road, Dublin 16
SD09A/0185South DublinLodged 5 May 2009Infrastructure
- Granted120 m away
Retention for existing 18m Unipole telecommunications structure, with associated antenna and dish within a…
Ballyboden St. Endas GAA Club, Firhouse Road, Dublin 16
SD15A/0263South DublinLodged 1 Sept 2015Retention
- Granted130 m away
Ballyboden St. Endas GAA, Camogie and Ladies Football Club intend to apply for permission for development at…
Pairc Uí Mhurchu, Firhouse Road, Dublin 16, D16 A2F8
SD24A/0180WSouth DublinLodged 17 Jul 2024Commercial
- Granted170 m away
Construction of 7 residential units with on curtilage car parking to comprise of 2 three storey semi-detached…
Charleville Manor, Firhouse, Templeogue, Dublin 16
SD15A/0363South DublinLodged 21 Jul 2016Housing estate
- Granted170 m away
4 no. 5 bed houses and all associated site works, including new entrance off the proposed Knocklyon Road and…
Charleville House, Firhouse Road, Templeogue, Dublin 16.
SD06A/0294South DublinLodged 10 Oct 2006Housing estate
- Granted170 m away
Modifications to previously approved permission SD06A/0294 for 4 no. 5 bed houses and all associated site…
Charleville House, Firhouse Road, Templeogue, Dublin 16
SD08A/0256South DublinLodged 18 Apr 2008Housing estate
- Granted180 m away
Alterations and small-extension to north-facing facade of existing sports clubhouse
Ballyboden St Enda's GAA Club, Firhouse Rd, Templeogue, D.16
S00A/0923South DublinLodged 2 Apr 2001Alterations
- Granted180 m away
4.5m high 'skills' wall in the south west corner. The proposed wall will extend from a point in the S.W.…
Páirc uí Mhurchú, Firhouse Road, Dublin 16
SD04A/0185South DublinLodged 10 Nov 2004Other
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
Tallaght to Ballyboden Cyce Route Scheme: proposed works will comprise the following — Construction of new…
Tallaght to Ballyboden Cyce Route Scheme
SD128/0003South DublinLodged 6 Sept 2012
- GrantedInfrastructure
[SDZ04A/3 forms part of this application]. Construction of the Adamstown Link Road linking the proposed…
Lands bounded generally by the, Outer Ring Road To The East The Dublin-Kildare, Rail Line To The South, The Griffeen Housing Development, To The North, And Adamstown Strategic Development Zone, To The West In The Town Lands Of, Adamstown, Kishogue And, Ba
SD04A/0964South DublinLodged 23 Dec 2004
- GrantedInfrastructure
Grand Canal Greenway — Hazelhatch to 12th Lock will include the following features: 4.6km of shared walking…
Hazelhatch to 12th Lock, Co. Dublin
SD188/0011South DublinLodged 14 Dec 2018
- GrantedInfrastructure
Permission to develop a greenway from Monaghan Town’s Coolshannagh roundabout (N2 junction with N12) to…
Monaghan Town (Coolshannagh Bridge) to border with Northern Ireland (Ardgonnell Bridge) ,
218005MonaghanLodged 1 Apr 2021
- Awaiting decisionInfrastructure
The development works that will consist of: (1) Construction of dedicated cycle track facilities on both…
R526 St. Nessans Road commencing to the south of St. Paul's Roundabout , and extending to the north of Ballykeeffe Roundabout , Dooradoyle
238013LimerickLodged 27 Sept 2023
- GrantedInfrastructure
Landscape improvement scheme along the N81 from the junction with the N82 (City West Road) to the M50 and…
N81 from the junction with the N82 (City West Road), Dublin 24
SD168/0006South DublinLodged 17 Nov 2016
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.