Jobstown Park, Tallaght, Dublin 24
Development of a BMX track, pump track, and associated facilities at Jobstown Park.
SD178/0008 · South Dublin County Council · Lodged 7 December 2017
- Reference
- SD178/0008
- Authority
- South Dublin County Council
- Register status
- In progress
- Type
- Application Under Part 8
- Received
- 7 December 2017
Summary
AI-generatedThis Part 8 application proposes a new BMX track with a 6-metre starting ramp, a pump track, and spectator areas. The development also includes management facilities, track access, a car park extension, and associated landscaping.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Bmx track
- Pump track
- Management and maintenance facilities; track access facilities
- Car park extension
- All ancillary works. Bmx track
- The key features of the proposed track are as follows
- The bmx track consists of 4 straights, with a split 2nd straight. The proposed track running width will start at 10m and progressively narrow to 6m wide on the 3rd and 4th straights
- The proposed starting ramp for the track will be a total height of 6m above ground level, with the starter gates positioned 1m lower at 5m high
- The proposed straights will range from approximately 70m to 80m in length, with jumps generally ranging from 0.7m to 2.1m high
- The proposed track will contain of 3 turns, each typically 3m in height, with room for spectators on the top of each turn
- The surface of the straights will consist of 10-6mm crushed stone, placed above subbase material, on top of a clay based, dry and well compacted, non-organic material
- The 3 turns will consist of a layer of asphalt, placed above subbase material, on top of a clay based, dry and well compacted, non-organic material
- The edges of the track will be topsoiled and grassed, with a proposed filter drain placed between each straight
- A staging area with 10 lanes is proposed for riders to assemble
- Next to the starter ramp, a junior start ramp at 3m above ground level is proposed
- An existing soccer pitch within jobstown park is proposed for relocation by approximately 30m to the south west
- The proposal includes for all ancillary items. Pump track
- The facility will include a pump track to the south east of the site. This will provide a warm up area for competent bmx riders and a training and development facility for less experienced riders
- The proposal includes for all ancillary items. Management and maintenance facilities
- Spectator areas will be included on top of each of the 3 turns
- Along the finishing straight (4th straight), a knee height rail, seating and grassed area is proposed
- Reinforced grass (using plastic porous pavers) is proposed to accommodate loading and unloading, along with 2 gates to the west of the facility. The proposed public and user entrance to the facility is on the south east corner
- Gravel footpaths are proposed within the facility for bmx riders and spectators
- Two facilities are proposed on site for club facilities, storage of maintenance equipment and for use to manage and maintain the track
- The entire bmx facility will be enclosed in 3m palisade fencing. The facility will include tree planting and additional space required will be grassed. A typical 3.5m grassed strip is proposed around the bmx track to facilitate grass cutting, routine maintenance and emergency services access (together with the 3 gates)
- It is proposed to include underground infrastructure required to upgrade the facility to have the possibility of both lighting and cctv in future
- The proposal includes for all ancillary items. Track access facilities
- An existing footpath within the park is proposed for removal and replacement with shared route outlined below
- The proposed track access will be in the south east corner of the facility
- This entrance will be linked to the existing park footpath and fortunestown way road by a proposed new shared path. In addition to this new shared path, a new shared path is also proposed within the park to the north of the facility
- The proposal includes for all ancillary items. Carpark extension
- A new car park is proposed to the west of the tallaght leisure centre. The size and position of these facilities are subject to detailed design. A car park for approximately 130 car spaces and a new access onto fortunestown way road is proposed
- The proposal includes for all ancillary items. The proposed scheme has undergone appropriate assessment screening under the habitats directive (92/43/eec) and environmental impact assessment screening under the eia directive 2014/52/eu. The requirement for second stage appropriate assessment has been screened out. The requirement for an environment impact assessment has been screened out. Plans and particulars of the proposed scheme will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy from thursday 7th december 2017 to friday the 12th january 2018 at the following locations
- South dublin county council offices, county hall, tallaght, dublin 24 between the hours of 9:00am
- 5.00pm monday to thursday and 9.00am
- 4.30pm on friday. Closed at weekends and bank holidays. (inspection and purchase). The offices will be closed to the public from saturday, 23 december and will re-open for business on tuesday, 2 january 2018
- County library, tallaght, dublin 24, between the hours of 9.45am to 8pm mon to thurs, 9.45am to 4.30pm fri to sat, closed saturdays and mondays of bank holiday weekends. (inspection and purchase). The library is closed from saturday, 23 december to monday, 1 january inclusive. Normal hours will resume from tuesday, 2 january 2018
- The plans and particulars can be viewed on the council’s public consultation portal website http://consult. Sdublincoco. Ie
- Submissions or observations with respect to the proposed development dealing with the proper planning and sustainable development of the area in which the proposed development will be situated may be made in writing up to 5pm on monday the 29th of january 2018 and may be submitted either: via online submissions: http://consult. Sdublincoco. Ie or by post to: senior executive officer, environment water and climate change department, south dublin county council, county hall, tallaght, dublin
- D24 ynn5. Note: please make your submission by one medium only. All submissions should include your name and a contact address. Https://consult. Sdublincoco. Ie/en/consultation/part-8-bmx-track-jobstown
Land-use zoning
What this land is zoned for
“To preserve and provide for open space and recreational amenities”
National zoning type: Open space, park
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 36 Bawnlea Green, Jobstown, Tallaght Dublin 24 | Jul 2025 | €294,000 | 307 m |
| 15 Kilclare Drive, Jobstown, Tallaght | Oct 2025 | €347,000 | 318 m |
| 8 Whitebrook Park, Springfield Estate, Tallaght | Mar 2026 | €342,500 | 322 m |
| 4 Raheen Rd, Springfield, Tallaght Dublin 24 | Dec 2025 | €386,000 | 348 m |
| 77 Raheen Close, Springfield, Tallaght Dublin 24 | Apr 2025 | €340,000 | 369 m |
| 42 Raheen Close, Tallaght, Dublin 24 | Aug 2025 | €450,000 | 371 m |
| 44 Raheen Close, Fortunestown Lane, Tallaght Dublin 24 | Jan 2025 | €249,499 | 376 m |
| 20 Kilclare Dr, Tallaght, Dublin 24 | Nov 2025 | €184,000 | 398 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received7 December 2017
- Decision issued12 February 2018
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted80 m away
A Masterplan for the future development of Jobstown Park, Tallaght, Dublin — This Masterplan includes the…
Jobstown Park, Tallaght, Dublin 24
SD118/0004South DublinLodged 2 Aug 2011Infrastructure
- Granted110 m away
Upgrade of Jobstown Park. he upgrade of the Jobstown Park will consist of: Upgrade of existing boundaries and…
Jobstown Park, In the Townland of Jobstown, Tallaght, Dublin 24
SD238/0002South DublinLodged 5 Apr 2023Infrastructure
- Granted150 m away
The installation of a roof mounted telecommunications apparatus comprised of antenna, transmission dishes,…
Tallaght Leisure Centre, Fortunestown Way, Tallaght, Co. Dublin
SD23A/0119South DublinLodged 22 Aug 2023Infrastructure
- Granted210 m away
Two storey end of terrace house to side of existing house with new vehicular access and all associated site…
11, Dromcarra Avenue, Dublin 24
SD21A/0160South DublinLodged 8 Sept 2021New dwelling
- Granted220 m away
2-storey end-terraced house, plus a new driveway to front of existing house
54, Whitebrook Park, Tallaght, Dublin 24.
SD03A/0619South DublinLodged 22 Aug 2003New dwelling
- Granted220 m away
2 storey, 3 bedroom dwelling, adjoining No. 59 Whitebrook Park with connection to existing public services…
59, Whitebrook Park, Tallaght, Dublin 24.
SD18A/0235South DublinLodged 7 Dec 2018New dwelling
- Refused220 m away
Two storey dwelling adjoining No. 59 Whitebrook Park with connection to existing public services and one…
59, Whitebrook Park, Tallaght, Dublin 24.
SD06A/0048South DublinLodged 26 Jan 2006New dwelling
- Refused220 m away
Two storey detached dwelling with connection to existing public services and 1no. car parking space at side
59, Whitebrook Park, Tallaght, Dublin 24.
SD05A/0836South DublinLodged 27 Oct 2005New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
Upgrade of Jobstown Park. he upgrade of the Jobstown Park will consist of: Upgrade of existing boundaries and…
Jobstown Park, In the Townland of Jobstown, Tallaght, Dublin 24
SD238/0002South DublinLodged 5 Apr 2023
- GrantedInfrastructure
A Masterplan for the future development of Jobstown Park, Tallaght, Dublin — This Masterplan includes the…
Jobstown Park, Tallaght, Dublin 24
SD118/0004South DublinLodged 2 Aug 2011
- Awaiting decisionInfrastructure
The upgrade of the Butler McGee Park will consist of — Four formal entry plazas at: – the Cheeverstown Road…
McGee Park, Cookstown Road, Springfield, Tallaght, Dublin 24
PT8SD340South DublinLodged 27 Jan 2026
- GrantedInfrastructure
Proposed Cycle Race Track: construct a 2.040 km long tarmacadam Cycle Race track (4.5m wide) located on a…
Corkagh Park, Clondalkin, Dublin 22
SD108/0001South DublinLodged 26 Feb 2010
- GrantedInfrastructure
The development will consist of a GAA Cluster Facility including: a) 3 no. floodlit GAA pitches (Pitches No's…
Townlands Of Tymon North And Templeogue, Spawell Golf and Leisure Centre, Templeogue, Dublin 6W, D6W PY06
SD23A/0304South DublinLodged 18 Oct 2024
- GrantedInfrastructure
Tallaght to Ballyboden Cyce Route Scheme: proposed works will comprise the following — Construction of new…
Tallaght to Ballyboden Cyce Route Scheme
SD128/0003South DublinLodged 6 Sept 2012
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.