Planning Permission Ireland
GrantedCommercialDecided 23 February 2018

Red Cow Complex, Naas Road, Dublin 22.

Addition of two storeys to the Red Cow hotel wing to provide 44 new bedrooms.

SD17A/0470 · South Dublin County Council · Lodged 21 December 2017

Reference
SD17A/0470
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
21 December 2017
Floor area
1780 m²

Summary

AI-generated

The proposal seeks to modify a previously permitted hotel extension by adding two extra storeys on top of the existing seven-storey wing. This will provide 44 additional bedrooms, balconies, terraces, and associated stair and lift modifications, increasing the floor area by approximately 1,780 square metres.

Commercialhotelextensioncommercial
Storeys
9

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Modifications to existing hotel extension previously permitted under reg. Ref's sd15a/0386 and sd15a/0318 to include the following: (i) provision of 2 additional storeys above the existing 7 storey hotel wing comprising 44 hotel bedrooms and north/south/east facing balconies and terraces; (ii) revisions to existing facade to accommodate the additional floors; (iii) alterations to stairs at all levels; (iv) provision of a fire fighting lift, lobby and new ground floor escape door associated with stair 2; (v) provision of plant and stair/lift cores at roof level; (vi) all associated site development works and services provision. The above revisions result in a net increase in gross floor area of hotel accommodation by c. 1780sq. M.

Land-use zoning

What this land is zoned for

REGENRE
To facilitate enterprise and/or residential led regeneration

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 December 2015. A completion certificate was lodged on 9 September 2020.

Notified floor area: 7,012

7 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
484 Ballymount Cottages, Clondalkin, Dublin 22Jun 2025€1,000,000191 m
8 Ballymount Rd, Clondalkin, Dublin 22Oct 2025€550,000306 m
94 Highgrove Apartments, Mount Talbot, Monastery RoadNov 2025€340,000477 m
111 Mount Talbot, Monastery Rd, Clondalkin Dublin 22May 2026€280,000477 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 December 2017
  2. Decision due23 February 2018
  3. Decision issued23 February 2018
  4. Grant issued4 April 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.