Site 14B, Greenogue Industrial Estate, Rathcoole, Co. Dublin.
Installation of roof-mounted solar panels at a waste transfer station.
SD18A/0055 · South Dublin County Council · Lodged 19 February 2018
- Reference
- SD18A/0055
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 19 February 2018
Summary
AI-generatedPlanning permission is sought for the installation of roof-mounted solar panels onto an existing waste transfer station, including all ancillary works.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Installation of roof mounted solar panels to existing waste transfer station and all ancillary works and services.
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received19 February 2018
- Further information requested10 April 2018
- Decision due18 March 2018
- Decision issued13 November 2018
- Application withdrawn13 November 2018
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Waste transfer and recycling facility including: erection and use of a 1729m2 warehouse building including…
Site 14B, Phase 3, Road 3A, Greengoue Industrial Estate, Rathcoole, Co. Dublin.
S01A/0868South DublinLodged 28 Mar 2002Industrial
- GrantedAt this site
An increase in the volume of waste accepted at it's facility to 95,000 tonnes per annum. This project is the…
Site 14B, Phase 3, Road 3A, Greenogue Industrial Estate, Rathcoole, Co. Dublin.
SD03A/0607South DublinLodged 16 Jan 2004Industrial
- GrantedAt this site
Development of temporary office for 5 years comprising of 162m.sq. of prefabricated free standing ancillary…
Site 14B, Phase 3, Road 3A, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD03A/0893South DublinLodged 2 Dec 2003Retention
- Part granted, part refusedAt this site
Retention of works at present under construction as follows: a) Omission of 233m.sq. integral ancillary…
Site 14B, Phase 3, Road 3A, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD03A/0581South DublinLodged 11 Aug 2003Retention
- GrantedAt this site
Construct a temporary proprietry foul treatment plant and associated percolation area
Greenogue Industrial Estate, Phase 3, Rathcoole, Co. Dublin
S00A/0154South DublinLodged 10 Mar 2000Infrastructure
- Refused30 m away
Amalgamation of Units 14A and 14B to create a single waste processing facility as follows: (1) demolition of…
Units 14A & 14B, Greenogue Industrial Estate, Rathcoole, Co. Dublin
SD19A/0234South DublinLodged 17 Jul 2019Industrial
- Granted30 m away
A new hazardous medical waste processing facility, including a change of use of the existing building…
Unit 14B, Grant’s Way, Greenogue Business Park, Rathcoole, Co Dublin, D24 FV02
SD25A/0101WSouth DublinLodged 29 Apr 2025Industrial
- Refused30 m away
Retention of development of temporary offices for 3 years; development comprises 162sq.m. of prefabricated…
Site 14B, Grants Way, Greenogue Industrial Estate, Rathcoole, Co. Dublin.
SD13A/0237South DublinLodged 25 Nov 2013Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The installation of roof mounted solar panels to existing waste transfer station and all ancillary works and…
I.P.R., Ballymount Road Lower, Walkinstown, Dublin 12.
SD18A/0046South DublinLodged 12 Feb 2018
- GrantedEnergy
Installation of roof mounted solar panels to existing materials recovery and transfer facility and all…
Glynntown, Sarsfield Court Industrial Estate, Sarsfield Court, Glanmire, Co. Cork
184526corkLodged 5 Mar 2018
- GrantedEnergy
Works to existing waste management building including the installation of roof mounted solar panels and all…
Dublin Regional Materials Recovery Facility, Merrywell Industrial Estate, Ballymount Road Lower, Dublin 22
SD17A/0382South DublinLodged 25 Oct 2017
- GrantedEnergy
The installation of roof mounted solar panels to existing materials recovery facility and all ancillary works…
Ballykeefe , Dock Road , Limerick.
19672LimerickLodged 5 Jul 2019
- GrantedEnergy
Installation of roof mounted solar panels over an existing Waste Transfer/Recycling building and all…
Panda Waste Management, Ballymount Road Upper, Dublin 24
SD20A/0076South DublinLodged 18 Mar 2020
- GrantedEnergy
The development will consist of new solar panels over the roof of 2 no. existing transfer /recycling waste…
Rathdrinagh , Beauparc Navan , Co. Meath
LB170284MeathLodged 21 Mar 2017
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.