Planning Permission Ireland
GrantedApartmentsDecided 28 August 2018

Bruce House, Main Street, Talllaght, Dublin 24.

Demolition of a commercial building to build a five-storey building with 31 apartments and a retail unit in Tallaght.

SD18A/0239 · South Dublin County Council · Lodged 5 July 2018

Reference
SD18A/0239
Authority
South Dublin County Council
Register status
Appealed
Type
Permission
Received
5 July 2018
Residential units
31
Floor area
3230 m²

Summary

AI-generated

The project involves the demolition of an existing commercial building and the construction of a five-storey mixed-use building. It will feature one ground-floor retail unit and 31 apartments with private balconies, utilizing 29 car parking spaces in the basement of the adjoining Priorsgate scheme.

Apartmentsapartmentsdemolitionmixed use
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The demolition of the existing part single-storey, part two storey commercial building (c. 510sq. M) and the construction of a 5 storey mixed use building (c. 3,230sq. M) comprising 1 retail unit (c. 100sq. M), 32 enclosed bicycle parking spaces, plant, bin stores and an esb substation at the ground floor level and 31 apartment units at the ground to fourth floor levels, including 11 1-bedroom units, 19 2-bedroom units and 1 3-bedroom unit, with private balconies/terraces. A total of 29 car parking spaces are proposed to facilitate the proposed development in the existing basement level of the adjoining mixed-use priorsgate scheme to the south and west, in lieu of the previously permitted, vacant car showroom display use at this level (as granted under an bord pleanála ref. Pl. 06s. 206768). The development will also include the provision of louvres to the existing glazed openings at basement level of the priorsgate scheme fronting onto the tallaght by pass (n81) to the south; the removal of the existing boundary treatment between the priorsgate and bruce house sites to facilitate a pedestrian connection between the existing and proposed mixed use schemes; piped infrastructure and ducting; roof plant including lift overrun; changes in level; attenuation areas; site landscaping; communal open space including a children's play space (c. 686sq. M) and all associated site development and excavation works above and below ground all on a site of c. 0.29 ha site.

Land-use zoning

What this land is zoned for

VCUC
To protect, improve and provide for the future development of Village Centres

National zoning type: City/Town/village Centre, central area

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 151, Priors Gate, Main St Dublin 24May 2026€276,50025 m
29 Priorsgate, Tallaght Village, Tallaghtnot full market priceJun 2025€280,00045 m
82 Priorsgate, Block 2, Greenhills Rd Tallaght Dublin 24Jan 2025€235,00049 m
77 New Bancroft Hall, Tallaghtprice excludes VATFeb 2025€281,000114 m
60 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Feb 2025€336,000115 m
62 New Bancroft Hall, Tallaght, Dublin 24May 2025€336,000115 m
61 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24May 2026€326,000115 m
31 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Aug 2025€330,000119 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 July 2018
  2. Decision due29 August 2018
  3. Decision issued28 August 2018
  4. Appeal submitted24 September 2018
  5. Appeal decided28 January 2019
  6. Permission expiry24 January 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.