Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
Reconfiguration and alterations to a previously approved warehouse building.
SD18A/0268 · South Dublin County Council · Lodged 24 July 2018
- Reference
- SD18A/0268
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 24 July 2018
- Floor area
- 339 m²
Summary
AI-generatedThe application seeks alterations to a previously approved warehouse development. The changes include internal floor reconfigurations of the industrial, office, and staff areas, as well as elevational revisions to the doors.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Alterations to reg. Ref. Sd16a/0216 which involved demolition of remaining part of fire damaged building and the construction of a warehousing unit which is now being revised. The alterations comprise: (a) reconfiguration of internal floor arrangement of industrial building from
- 2,100sq. M. Of light industrial unit to 1,973sq. M; 154sq. M of ancillary offices on 2 floors with 39sq. M of staff facilities to 220sq. M of offices with 188sq. M of staff facilities; 189sq. M of mezzanine storage to 43sq. M. The above reconfiguration comprises: (1) change of use of light industrial area to office/staff facilities area (75sq. M) and office/staff facilities to light industrial area (10sq. M. ) at ground level; mezzanine to office/staff facilities (78sq. M) and light industrial area (110sq. M) at first floor level; office/staff facilities to light industrial area (8sq. M). (2) provision of new staff facilities area (15sq. M) and mezzanine (43sq. M) within the previous granted industrial building footprint (total revised area 339sq. M). (b) elevation revisions associated with the floor plan/layout adjustments including rearrangement of fire doors and level entry goods door to the east elevation, removal of a dock leveller to the rear elevation and change of cladding type and colour on all sides of the building. (c) site plan revisions including access adjustments to provide 2 access/egress gate for hgv’s and cars as opposed to previous proposed separate access/egress for hgv’s and cars and 1 pedestrian gate plus minor drainage alterations. Site boundary and height of the proposed industrial unit is not affected by this altered proposal
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 31 May 2018. A completion certificate was lodged on 4 June 2019.
Notified floor area: 2,482 m²
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 8 Ballymount Rd, Clondalkin, Dublin 22 | Oct 2025 | €550,000 | 210 m |
| 484 Ballymount Cottages, Clondalkin, Dublin 22 | Jun 2025 | €1,000,000 | 280 m |
| 5 Dunmore Park, Kingswood, Tallaght | Jan 2026 | €330,000 | 483 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received24 July 2018
- Decision due17 September 2018
- Decision issued17 September 2018
- Grant issued30 October 2018
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- InvalidAt this site
(a) Reconfiguration of internal floor arrangement of industrial building from 2,100sq.m. of light industrial…
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
SD18A/0160South DublinLodged 10 May 2018Alterations
- GrantedAt this site
Demolition of remaining part of fire damaged building originally 2,473sq.m (10m high) and construction of…
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
SD16A/0216South DublinLodged 21 Jun 2016Industrial
- GrantedAt this site
Erect 2 non-illuminated coloured advertising signs: panel sign located at 5.75m above ground level (below…
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
SD06A/1022South DublinLodged 29 Nov 2006Commercial
- Part granted, part refusedAt this site
Erection of signs on north east and south west elevations of building; the sign on the south west elevation…
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
SD06A/0562South DublinLodged 4 Jul 2006Commercial
- Granted50 m away
The installation of a 1.62m x 0.87m x 0.5m (HxWxD) gas pressure reduction unit and 3.25m (H) vent stack, with…
The footpath adjacent the premises occupied by Schoolwear House, Ballymount, Co. Dublin
SD22A/0474South DublinLodged 22 Dec 2022Infrastructure
- Granted60 m away
To retain the existing 45 metre high telecommunications support structure (previously granted permission…
Block C, Ballymount Cross Industrial Estate, Dublin 24
SD17A/0173South DublinLodged 6 Jun 2017Retention
- Granted60 m away
Retention of existing 45 metre high telecommunications support structure carrying antennas and link…
Block C, Ballymount Cross Industrial Estate, Dublin 24
SD11A/0002South DublinLodged 16 Aug 2011Retention
- Granted60 m away
Replace the existing permitted 24m monopole structure, Planning Ref. S98A/0492 with a 45m monopole structure…
Block C, Ballymount Cross Industrial Estate, Dublin 24
SD03A/0545South DublinLodged 31 Jul 2003Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidAlterations
(a) Reconfiguration of internal floor arrangement of industrial building from 2,100sq.m. of light industrial…
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
SD18A/0160South DublinLodged 10 May 2018
- GrantedAlterations
Alterations to previously approved scheme for a warehousing development (Reg. Ref. SD17A/0195) comprising:…
Site 662, Jordanstown View, Greenogue Business Park, Rathcoole, Co. Dublin
SD17A/0467South DublinLodged 22 Dec 2017
- GrantedAlterations
Alterations to an existing planning permission Reg. Ref. SD21A/0162 for a warehouse development of 2 units…
Brownsbarn, Citywest Campus, Dublin 24.
SD22A/0313South DublinLodged 26 Jul 2022
- GrantedAlterations
Alterations to existing granted planning permission SD16A/0074, as follows; (1) Relocation of part of eastern…
517A, Grants Rise, Greenogue Business Park, Rathcoole, Co. Dublin
SD16A/0330South DublinLodged 16 Dec 2016
- GrantedAlterations
Alterations to an existing granted planning application (previously granted permissions Reg. Ref. SD18A/0314…
Kingswood Business Park, Baldonnel, Dublin 22.
SD21A/0239South DublinLodged 1 Feb 2022
- GrantedIndustrial
Alteration to an existing granted planning application (Reg. Ref. SD07A/0074 and SD07A/0430) comprising…
Site 510, Greenogue Industrial Estate, Rathcoole, Co. Dublin.
SD07A/1006South DublinLodged 17 Dec 2007
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.