Planning Permission Ireland
GrantedExtensionDecided 28 May 2018

29, Templeroan Grove, Templeogue, Dublin 16.

Amendments to a previously approved two-storey side extension, including a new dining bay and rear elevation changes.

SD18B/0130 · South Dublin County Council · Lodged 3 April 2018

Reference
SD18B/0130
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
3 April 2018
Floor area
43 m²

Summary

AI-generated

The applicant is seeking amendments to a previously granted permission (Reg: Ref SD17B/0130). The changes include adding a new 3 square metre dining bay to the rear, revising the ground floor rear elevation, and making interior modifications to the ground floor.

Extensionextensionamendmentsuburban

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amendment to granted permission for reg: ref sd17b/0130 for the demolition of an existing single storey side extension & the construction of a two storey side extension including a new dormer window & roof light to the front elevation and new dormer window to the rear elevation, as well as widening existing vehicle entrance within the front boundary and all associated works. The proposed amendment includes the addition of a new 3sq. M. Dining bay to the rear, revised ground floor rear elevation & interior modifications to the gound floor. No amendments are being made to the front of the property.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 June 2018.

Notified floor area: 40

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
20 Templeroan Grove, Knocklyon, Dublin 16Apr 2025€613,00070 m
31 Scholarstown Park, Knocklyon, DublinAug 2025€600,000140 m
84 Scholarstown Park, Rathfarnham, Dublin 16Mar 2026€571,000194 m
37 Templeroan Way, Ballyroan, Dublin 16Apr 2026€600,000214 m
79 Scholarstown Park, Rathfarnham, Dublin 16Aug 2025€570,000222 m
5 Scholarstown Park, Knocklyon, Dublin 16Apr 2025€612,000242 m
20 Templeroan Close, Knocklyon, Dublin 16Jul 2025€725,000265 m
27 Templeroan Close, Knocklyon, Dublin 16Jan 2025€724,000290 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 April 2018
  2. Decision due28 May 2018
  3. Decision issued28 May 2018
  4. Grant issued6 July 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.