Planning Permission Ireland
GrantedAlterationsDecided 3 September 2018

6, Bancroft Court, Tallaght, Dublin 24

Change of house type from a dormer bungalow to a two-storey flat-roofed house in Tallaght.

SD18B/0311 · South Dublin County Council · Lodged 11 July 2018

Reference
SD18B/0311
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
11 July 2018
Floor area
38.6 m²

Summary

AI-generated

The application proposes a change of house type from a previously approved 3-bedroom dormer bungalow to a 4-bedroom, two-storey flat-roofed house. The changes include significant elevation alterations, a raised roof level, a small first-floor front extension, and major internal layout modifications.

Alterationsredesignextension
Residential unit
1
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Change of house type from a detached 3 bed, 2 bathroom, one and a half storey dormer bungalow with dormer windows to the front to a 4 bed, 4 bathroom, two storey flat roofed house, with significant elevation changes, removal of the dormer windows & replacement with large windows and a raised ground floor head height, raised roof level and new chimney to the side, a small first floor extension to the front and major internal alterations such as relocation of the utility, wc and stairs all within the original house footprint.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 May 2023.

Notified floor area: 38.6

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
36 Main Road, Tallaght, Dublin 24May 2026€540,00032 m
44 Castle Park, Tallaght, Dublin 24Jan 2026€393,00098 m
43 Castle Park, Tallaght, Dublin 24Mar 2026€340,000101 m
20 Castle Park, Tallaght, Dublin 24Mar 2026€360,000169 m
29 Glenview Park, Tallaght, Dublin 24Nov 2025€460,000185 m
75 Castle Park, Tallaght, Dublin 24Feb 2026€380,000199 m
21 Newtown Park, Tallaght, Dublin 24not full market priceApr 2025€160,000200 m
27 Tymon Farm Lane, Tallaght, Dublin 24May 2025€297,500201 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 July 2018
  2. Decision due4 September 2018
  3. Decision issued3 September 2018
  4. Grant issued15 October 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.