Planning Permission Ireland
GrantedIndustrialDecided 18 April 2019

Monastery Road, Clondalkin, Dublin 22

Addition of a recycled asphalt pavement plant to an existing facility in Clondalkin.

SD19A/0063 · South Dublin County Council · Lodged 27 February 2019

Reference
SD19A/0063
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
27 February 2019

Summary

AI-generated

The development proposes adding a recycled asphalt pavement (RAP) plant to an existing asphalt facility on a 3.0-hectare site. The new plant will include a cold feed bin, conveyors, a buffer silo, and a weighing conveyor, with no changes to existing working hours or production rates.

Industrialasphaltindustrialrecyclinginfrastructure
Floor area
30,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Addition of a recycled asphalt pavement (rap) plant to the existing asphalt plant on a 3.0 hectare site within the company's existing landholding; the proposed rap plant comprises a rap cold feed bin (hopper); a rap collecting conveyor; an inclined (rising) conveyor; a rap buffer silo with belt feeder; a rap weighing conveyor and a dedicated chute and ducting system connecting to the existing asphalt plant; the proposed development will not result in any change in existing working hours or current production rates; recycled bituminous material to be supplied to the rap plant will be stored at an existing storage shed at the application site.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 September 2019.

Notified floor area: 286

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
9 St Brigids Cottages, Clondalkin, Dublin 22Jun 2025€335,000122 m
10 St Bridget's Cottage, Clondalkin, Dublin 22Jun 2025€410,000123 m
64 Woodford Lawns, Monastery Rd, ClondalkinMay 2025€360,000175 m
58 Woodford Lawns, Clondalkin, Dublin 22Dec 2025€363,500194 m
9 Monastery Gate Green, Monastery Rd, Clondalkin Dublin 22price excludes VATJun 2025€450,000197 m
6 Monastery Gate Ave, Clondalkin, Dublin 22Oct 2025€428,000240 m
8 Monastery Gate Avenue, Clondalkin, Dublin 22Jan 2026€380,000247 m
11 Monastery Gate Ave, Clondalkin, Dublin 22Mar 2025€425,000272 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 February 2019
  2. Decision due23 April 2019
  3. Decision issued18 April 2019
  4. Grant issued28 May 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.