Planning Permission Ireland
RefusedApartmentsDecided 12 June 2019

Kiltipper Cafe Bar, Marlfield, Tallaght, Dublin 24

Conversion of a vacant first-floor restaurant in Tallaght into six apartments.

SD19A/0135 · South Dublin County Council · Lodged 18 April 2019

Reference
SD19A/0135
Authority
South Dublin County Council
Register status
Appealed
Type
Permission
Received
18 April 2019
Residential units
6
Floor area
502 m²

Summary

AI-generated

The project involves a change of use for the vacant first-floor restaurant at Kiltipper Cafe Bar to create six apartments, consisting of two one-bedroom and four two-bedroom units. The development includes private balconies, minor elevation alterations, communal open space access, and basement parking.

Apartmentsconversionapartmentschange of use
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(1) change of use of vacant first floor level restaurant approved under ref. Sd02a/0482 to provide a residential use comprising a total of 6 apartments, including 2 one bedroom and 4 two bedroom units with apartments 1, 2 and 5 served by private balconies; (2) minor alterations to northern, western and southern elevations; (3) access to communal open space at first floor level; (4) 6 vehicular parking spaces at basement level; 6 dedicated bicycle/storage units at mezzanine level and dedicated bin storage area at ground floor level; (5) all ancillary works necessary to facilitate the development.

Land-use zoning

What this land is zoned for

LCDC
To protect, improve and provide for the future development of Local Centres

National zoning type: District, neighbourhood centre

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
43 Marlfield Terrace, Kiltipper, Tallaght Dublin 24Jun 2026€352,00043 m
38 Marlfield Terrace Kiltipper Way, Dublin 24, DublinMar 2025€255,00043 m
32 Marlfield Mall, Kiltipper Way, Tallaght Dublin 24Dec 2025€215,00059 m
21 Marlfield Terrace, Kiltipperway, TallaghOct 2025€285,00063 m
15 Marlfield Terrace, Tallaght Dublin 24, DublinApr 2026€295,00074 m
11 Marlfield Terrace, Kiltipper, Dublin 24Apr 2026€280,00079 m
10 Marlfield Terrace, Tallaght, Dublin 24Apr 2026€179,00079 m
121 Kiltipper Gate, Kiltipper Way, Tallaght Dublin 24Aug 2025€312,00080 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 April 2019
  2. Decision due12 June 2019
  3. Decision issued12 June 2019
  4. Appeal submitted9 July 2019
  5. Appeal decided19 November 2019
  6. Permission expiry9 November 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.