Planning Permission Ireland
GrantedEnergyDecided 31 July 2019

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22.

Alterations to a previously approved 110kV gas insulated substation in Clondalkin.

SD19A/0185 · South Dublin County Council · Lodged 7 June 2019

Reference
SD19A/0185
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
7 June 2019
Floor area
1702 m²

Summary

AI-generated

The application seeks alterations to approved plans for a two-storey 110kV Gas Insulated Substation and associated buildings. Changes include the relocation of client transformers, a control building, and an energy centre building to facilitate a revised layout, secured by high fencing.

Energysubstationinfrastructureenergy
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to approved plans (grant of permission ref pl06s. 243151 and pa reg ref sd13a/0271 and sd18a/0068) to the previously granted planning permission for the construction of an esb 110kv gas insulated substation for the use by crag digital limited in support of the development and to incorporate an esb network substation to improve and upgrade power supply to clondalkin and adjoining areas; the proposed esb 110kv gas insulated substation is a two storey building of gross floor area of 1,586sq. M and client control room building of an area of 116sq. M; single storey 2mv esb substation of 38sq. M floor area is proposed to be constructed to facilitate the construction of the already granted development until completion and commissioning of the proposed esb 110kv gis substation, including for 3 esb external transformers and 3 crag digital limited external transformers; alterations include for the relocation on site of previously granted client transformers, control building and energy centre ancillary building to facilitate the revised esb 110kv substation building layout; esb substation and client control building and transformer compound are to be secured with a 2.6m and 3m high palisade fence and access gates; all landscaping and ancillary site works as per previously granted planning permission sd18a/0068.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 8 February 2021. A completion certificate was lodged on 24 June 2025.

Notified floor area: 49.9

9 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 18 Block A Aras Na Cluaine, Yellow Meadows Road, Nangar RdMay 2025€257,000235 m
28a Aras Na Cluaine, Clondalkin, Dublin 22Feb 2026€210,000235 m
73 B Aras Na Cluaine, Woodford Walk, Nangor Rd ClondalkinDec 2025€227,000240 m
59b Aras Na Cluaine, Clondalkin, Dublin 22Mar 2026€246,000240 m
C125 Aras Na Cluaine, Nangor Rd, Clondalkin Dublin 22Apr 2025€265,000240 m
181 Aras Na Cluaine, Clondalkin, Dublin 22May 2025€262,000309 m
167 Aras Na Cluaine, Clondalkin, Dublin 22Mar 2025€250,000309 m
Apt 172c, Aras Na Cluaine, Yellow Meadows Rd Dublin 22Jan 2025€217,000309 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 June 2019
  2. Decision due1 August 2019
  3. Decision issued31 July 2019
  4. Grant issued9 September 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.