Planning Permission Ireland
GrantedAlterationsDecided 26 September 2019

15, Fortfield Drive, Terenure, Dublin 6W, D6W DK40

Alterations to previously approved extension works at a house in Terenure.

SD19B/0304 · South Dublin County Council · Lodged 2 August 2019

Reference
SD19B/0304
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
2 August 2019
Floor area
228 m²

Summary

AI-generated

The application proposes alterations to previously approved works under planning reference SD19B/0018. Changes include reducing the size of the permitted side and rear extensions, removing the permitted porch and bay window, and omitting the attic conversion.

Alterationsalterationsamendment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to the previously approved works (planning ref: sd19b/0018), consisting of reduction of permitted first extension to the side of the existing dwelling; reduction of permitted first floor extension to the rear of the existing swelling; reduction of permitted ground floor extension to the rear of existing dwelling; removal of permitted porch and bay window extension to ground floor front elevation; omission of permitted attic conversion with a new dormer rooflight to the rear roof slope; all associated alterations to the elevations, internal layouts, site, drainage, ancillary and landscaping works.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 November 2019.

Notified floor area: 228

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
29 Fortfield Dr, Terenure, Dublin 6wNov 2025€1,950,00092 m
22 Fortfield Park, Terenure, Dublin 6wJan 2025€1,750,000184 m
215 Templeogue Rd, Terenure, Dublin 6wFeb 2025€1,205,000198 m
56 Bushy Park House, Templeogue, Dublin 6wJul 2025€699,000224 m
28 Bushy Park House, Templeogue Rd, Terenure Dublin 6wOct 2025€585,000224 m
Apt 45, Bushy Park House, Templeogue Rd Dublin 6wJun 2025€750,000224 m
1 Templeville Park, Templeogue, Dublin 6wJul 2025€1,100,000247 m
34 Fortfield Park, Terenure, DublinSept 2025€1,270,000254 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 August 2019
  2. Decision due26 September 2019
  3. Decision issued26 September 2019
  4. Grant issued1 November 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.