Planning Permission Ireland
GrantedChange of useDecided 26 March 2020

Unit 2, The Square Industrial Complex, Belgard Square East, Tallaght, Dublin 24

Renovation and change of use of an industrial unit to an office, training, and distribution centre.

SD20A/0017 · South Dublin County Council · Lodged 31 January 2020

Reference
SD20A/0017
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
31 January 2020
Floor area
441.6 m²

Summary

AI-generated

Renovation and modifications to an existing building to facilitate a change of use to an office, training, and distribution centre. Works include internal layout changes, moving a fire stair, extending the mezzanine area, adding toilets, modifying rear windows and roller doors, and installing new front signage.

Change of usechange of useofficerenovationmezzanine

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.

Land-use zoning

What this land is zoned for

TCUC
To protect, improve and provide for the future development of Town Centres

National zoning type: City/Town/village Centre, central area

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 December 2022. A completion certificate was lodged on 17 April 2023.

Notified floor area: 675.43

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
26 Tuansgate, Belgard Sq East, Tallaght Dublin 24Jul 2025€283,000175 m
49 Tuansgate, Belgard Sq, Tallaght Dublin 24Jul 2025€215,000175 m
Apt 62, Tuansgate, Belgard Sq East Dublin 24Nov 2025€310,000175 m
32 Exchange Hall, Belgard Sq North, Tallaght Dublin 24Dec 2025€212,000182 m
51 Exchange Hall, The Exchange, Belgard Sq North Dublin 24Feb 2025€191,000182 m
22 Exchange Hall, The Exchange, Belgard Sq North Dublin 24Mar 2025€227,000182 m
43 Exchange Hall, Belgard Sq North, Tallaght Dublin 24May 2025€180,000182 m
77 Exchange Hall, Tallaght, Dublin 24May 2026€242,500182 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 January 2020
  2. Decision due26 March 2020
  3. Decision issued26 March 2020
  4. Grant issued22 June 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.